Download presentation
Presentation is loading. Please wait.
1
Manager’s Report to WIRA May 30, 2018
Wallops Research Park Manager’s Report to WIRA May 30, 2018
3
Aerospace and Aviation operations
Wallops Research Park Primary objective: Find tenants for the park, particularly for those seeking to leverage and enhance the capabilities of the Mid-Atlantic Regional Spaceport (MARS) and NASA Wallops Flight Facility (NASA WFF). Aerospace and Aviation operations Unmanned Aircraft Systems (UAS) Medium class space launch vehicles
4
Progress Summary Ownership - Leadership Marketing
5
PURPOSE Wallops Research Park (WRP): WRP is a research park including land, infrastructure, taxiway to connect with the Wallops runway and to create an overall attractive environment to support economic growth and the missions of NASA/GSFC/WFF and Chincoteague Bay Field Station (CBFS) through new commercial and educational institutions located within the park. WRP consists of Accomack County land, NASA/GSFC/WFF land leased by Accomack County and CBFS land. Space Act Agreement 2009
6
Developable Acreage Accomack County 92 NASA. 66 CBFS 43 TOTAL 211
Developable Acreage Accomack County 92 NASA* 66 CBFS 43 TOTAL 211 *leased to Accomack Co.
7
2006 Memorandum of Understanding 2009
Authorization PHASE 2006 Memorandum of Understanding 2009 Virginia Code , Authorizes WRP as a Service District Established WRP Leadership Council (WRP LC) NASA/GSFC/WFF Lease of 66.4 Acres to Accomack County Space Act Agreement 3.4 ac parcel sold to Garrett Development WING Building Construction (15,000 sf NG & MARS)
8
Funding PHASE 2013 Funding 2014 Staffing
Taxiway $4M Commonwealth of Virginia TPOF Park Infrastructure $4M Accomack County Bond 2014 Staffing Full Time Manager The Timmons Group as Project Engineer Davis, Bowen & Friedel as Project Manager
9
Construction PHASE Dixie Design/Bid/Build Roads & Utilities Contractor EV Williams Design/Build Taxiway Contractor Timmons and Davis, Bowen & Friedel consulting roles continue through 2015
10
Marketing STRENGHTS WRP Infrastructure and taxiway are complete and stabilized Wallops Complex is a incredible economic and prestige engine for Accomack County, Eastern Shore and Commonwealth of Virginia NASA/WFF Virginia Space/MARS CBFS Navy NOAA WIRA Aerospace Industry Contractors & Supply Chain
11
Marketing ISSUES CBFS property for sale Short defense contract length
Building availability Mergers & Acquisition transitioning Inconsistent marketing efforts
12
Marketing CHALLENGES No central leadership for marketing Wallops Complex Accomack County WRP Manager - Responsibility split between WRP, EDA and other Econ. Dev. Opportunities Virginia Space Executive Director - Primary responsibility for launch and UAS operations Commonwealth of Virginia - Support and management of inquiries NASA/WFF - Support through direct agreements
13
Marketing CHALLENGES Leadership Council Transitioning of Appointees
Chair Resignation County Administrator – New Representation as of 2017 CBFS – Permanent in 2018 (Chet Chesterfield) VCCS – Temporary assignment in 2018 (Billy Greer) NASA – Chair/Designee Change Undetermined Virginia Secretary of Commerce Appointee – TBD
14
Covenants, Conditions & Restrictions Updated 2018
OPPORTUNITIES Tax incentive program for new business location into established parks in selected areas (Ref. SB883, HB222) Covenants, Conditions & Restrictions Updated 2018 Restructure of State VEDP 2018 Construction complete & contracts closed 2017 BOS open to engaging in conversations concerning selling or leasing County property
15
ISS Launches expected at rate of 2 per year to 2024
TRENDS ISS Launches expected at rate of 2 per year to 2024 Vector contract and like opportunities for sun synchronous flight opportunities Federal support for space commercialization Mergers and Acquisitions Orbital ATK Purchase by Northrop Grumman Aurora Purchase by Boeing DOD Contractor awards UAS/UxS Surge Vanilla 5 day flight from Virginia Space Runway Infrastructure planned for island and inter coastal waters
16
ASK Appreciation for the Wallops assets Gratitude for good paying jobs Pride in work accomplished thus far Flexibility with new business recruitment efforts Willingness to incorporate entrepreneurial efforts Support for single Wallops Complex story initiative Patience with transitioning of leadership
17
Julie Wheatley, WRP Manager
Accomack County Economic Development (W) or (C) 23296 Courthouse Avenue Accomac, VA 23301
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.