Abbas Shirian, PE Certified GeoExchange Designer
Life Cycle Cost Abbas Shirian, PE Certified GeoExchange Designer
2
Life Cycle Cost Analysis
“to evaluate all cost factors including first cost, operation, maintenance, replacement, and estimated energy use over a period of years for alternatives that equally satisfy functional requirements”.
3
Initial Cost & Design Variables
Equipment – Standard Efficiency or High Efficiency Drilling cost - Borehole Depth, Pipe Size & Site Conditions Piping Accessories Outside Air & Ventilation System Distribution & Pumping System System Design Controls System Value of Floor Square Footage For Mechanical Rooms Additional Cost for Structural Reinforcement Additional Cost for Roof Access and Repairs Additional Cost for Sound Proofing
4
Service Life & Replacement
Life Expectancy of HVAC Equipment Life of Ground Loop Heat Exchanger Life of Water Distribution/Equipment Life of Air Distribution System Life of Control System
5
Energy Costs Utility Structure of Electric Rates
Natural Gas and Fuel Cost Inflation Rate Equipment Efficiencies Pumping Efficiency
6
GSHP & Gas/Elec HVAC Heating Energy Cost
7
Ground Source Heat Pump Electricity at $0.08/kWh & cop at 3.7
$0.08/kW x kW/3412 Btu x 100,000 Btu/therm x 1/cop = $0.63/therm or $6.30/MMBtu Gas/Electric HVAC System Natural gas at $0.90/therm & 80% efficiency $0.90/therm x 1/efficiency = $1.13/therm or $11.30/MMBtu
8
Operating, Maintenance and Replacement Costs
ASHRAE Mean’s Handbook Equipment Manufacturers Contractors Owner’s O&M
9
Salvage Value Zero out at end of life for all alternatives
Ground Heat Exchanger Salvage Value
10
Cost of Money Depreciation Method Energy Cost Inflation Rate
Interest Rate Percent Financed Income Tax Rate Study Life Depreciation Life
11
Typical Financial Cost
Life of Analysis yrs Cost of Borrowing Money 5-10% Inflation % Electric Energy Escalation 2-3% Natural Gas Energy Escalation 3-5% Tax Rate % Cost of Insurance %
12
HVAC First Cost ($/sq. ft. ) Based on 77,000 sq. ft
HVAC First Cost ($/sq.ft.) Based on 77,000 sq.ft. school & 220 ton cooling Geothermal Heat Pump ($2000/borehole) $25.22 Geothermal Heat Pump ($3000/borehole) $28.08 Water Source Heat Pump $22.81 VAV, AHU & TU/HW (Water Cooled Chiller) $30.04 VAV, AHU & TU/HW (Air Cooled Chiller) $27.85 Packaged Rooftop DX/Gas $20.39 Indoor Air Washer &HW Heating $28.85 Fan Coil (4- Pipe) (Water Cooled Chiller) $28.68 Fan Coil (4- Pipe) (Air Cooled Chiller) $26.49
13
Real Estate/Structural Savings
No mechanical rooms to house boilers or chillers with geothermal and air-cooled unitary No fan rooms or penthouses with geothermal heat pump (horizontal) and 4-pipe fan coil unit systems
14
Annual Maintenance Cost ($/Ton)
Geothermal Heat Pump $67.24 Water Source Heat Pump $70.45 VAV, AHU & TU/HW (Water Cooled Chiller) $43.23 VAV, AHU & TU/HW (Air Cooled Chiller) $40.85 Packaged Rooftop DX/Gas $59.24 Indoor Air Washer & HW Heating $70.45 Fan Coil (4- Pipe) (Water Cooled Chiller) $56.04 Fan Coil (4- Pipe) (Air Cooled Chiller) $53.23
15
Life Cycle Cost Geothermal Heat Pump Water Source Heat Pump
VAV, AHU & TU/HW (Water Cooled Chiller) VAV, AHU & TU/HW (Air Cooled Chiller) Packaged Rooftop DX/Gas Indoor Air Washer & HW Heating Fan Coil (4- Pipe) (Water Cooled Chiller) Fan Coil (4- Pipe) (Air Cooled Chiller)
16
QUESTIONS & DISCUSSIONS