Download presentation
Presentation is loading. Please wait.
1
Institut de Physique Nucléaire de Lyon
MC-Production Status Production Evolution Some more numbers… Summary Philippe Gris LPC Clermont-Ferrand Tibor Kurča Institut de Physique Nucléaire de Lyon DØ-France May 31, 2011 LPNHE Paris May 31, 2011 T.Kurča - D0-France
2
Weekly MC-Production May 2010 SAMGrid 70M 50M CCIN2P3-Lyon OSG
FZU - Prague 70M 50M CCIN2P3-Lyon OSG SAMGrid/LCG Average: ~30M/week Absolute records !!! Average (Feb ): 50 M/w (record 70M/w, 38M IN2P3) Sustained rate for 2010: 35 M/w ? long term goal : 40 M/w ?
3
Weekly MC-Production Cumulated last 12 months: total 2520 M events
966 M ~ 38% CCIN2P3 Average rates : weekly 48.6 M (35 40 M) daily M Absolute Record: M/week Inconvenience: request on OSG could run many weeks – small farms (opportunistic usage, jobs could be even killed…) May 31, 2011 T.Kurča - D0-France 3
4
MC-Production Rates /week Sites
May 2010 Corrected average rates estimates for this year (?): CC 16M + OSG 10M + SG 10M + LCG 4M = 40 M/week
5
Weekly MC-Production Current (expectation 2010) 5.3 M (4) 13 M (10)
May 31, 2011 T.Kurča - D0-France 5
6
LCG-FR MC-Production Last 12 months Average weekly 1.4 M
Prod stopped by DØ management because of complaints from DØ-FR …. Average weekly M Total : M events lyogrid02 (IPNL) : 58.6 M grid10 (LAL) : 18.4 M CPPM, Clermont-Ferrand; To be added – already > 2 months …. seems not really a priority for FNAL …. May 31, 2011 T.Kurča - D0-France 6
7
LCG MC-jobs (last month)
As of May 29, 2011 site -CE still idle launched succeeded failed ce.gina.sara.nl 2 6501 974 ce.grid.rug.nl 6 1901 231 ceprod04.grid.hep.ph.ic.ac.uk 173 17 2550 276 grid10.lal.in2p3.fr 55 115 2284 38 lyogrid02.in2p3.fr 62 16613 424 trekker.nikhef.nl 85 13927 821 --TOTAL-- 236 281 43776 2764 IPNL ~38 % ; LAL ~5% May 31, 2011 T.Kurča - D0-France 7
8
Generators & Releases d0release Pythia Alpgen Herwig MC@NLO
Run2a p v6_409 v2.11_d0 v6_507 p v6_409 v2.11_d0 v6_ Run2b1 p v6_409 v2.11_d0_wcfix v6_510a p v6_409 v2.11_d0_wcfix v6_510a p v6_419 v2.11_d0_wcfix v6_510a p v6_421 v2.11_d0_wcfix v6_510a p v6_421 v2.11_d0_wcfix v6_510a Run2b2 p v6_421 v2.11_d0_wcfix v6_510a p v6_424 v2.11_d0_wcfix v6_510a Run2b3 p v6_409 v2.11_d0_wcfix v6_510a - each uses the same detector config as the corresponding run period - overlaid with ZeroBias events from the corresponding period - mixed requests (tarballs) to combine e.g. the same generator version with diff. reco T.Kurča - D0-France May 31, 2011
9
ZeroBias Datasets File Count: 1058 Average File Size: 342.40MB Run2a
Zerobias_p17_06_03MC_set1 File Count: Average File Size: MB Total Event Count: Total File Size: GB Run2b1 zerob_p20_09_03_RunIIbMC_online_0sup_only_sample_sept06_shutdown2007_warmcellfix File Count: Average File Size Total Event Count: Total File Size: GB Run2b2 zerob_p20_15_00_RunIIbMC_0sup_sample_postshutdown07_to_juneshutdown09_highlum File Count: Average File Size: MB Total Event Count: Total File Size: GB Run2b3 zerob_p20_17_01_RunIIbMC_0sup_runs_255328_to_262856 File Count: Average File Size: MB Total Event Count: Total File Size: GB T.Kurča - D0-France 9 May 31, 2011
10
MC-production/group/release
p x p x p p Total dzero higgs wz top bphysics np qcd jes algo (M – events) May 31, 2011 T.Kurča - D0-France
11
Summary production rates evolution better than expected
very good average production rates : ~7 M /day from February running mostly p possibility to run mixed releases the same generator version with different reco versions reintegration of CPPM & Clermont-Ferrand very slow don’t expect significant increase in capacity additional sites more stability reminder: keep the farms busy May 31, 2011 T.Kurča - D0-France
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.