Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tagging a Network Scheduling Right

Similar presentations


Presentation on theme: "Tagging a Network Scheduling Right"— Presentation transcript:

1 Tagging a Network Scheduling Right
NITS Training Guide 2017

2 Tag Submission There are a few areas on a tag submission that are unique for a Network Scheduling Right. The Product, OASIS, and NITS Resource Fields require specific attributes that are shown on the next slide. On Slide #4 the Asset Owner needs to be added to a specific “Misc Info” field in the Physical Path. These changes do not affect how GFAs or SPOT IN are currently tagged; these changes are for Firm Network tagging only.

3 Sample Tag 7-FN 1201 E-tag Transmission Allocation Product = 7-FN
AMIL.GBCCTG1 E-tag Transmission Allocation Product = 7-FN E-tag Transmission Allocation OASIS = Application Ref from OASIS (4-digit number) field, E.g. 1201 E-tag Transmission Allocation NITS Resource = The Resource Name used in OASIS must match exactly to the NITS Resource on the tag. E.G AMIL.GBCCTG1 E-tag Physical Path Sink = Sink from OASIS must match tag

4 Asset Owner Token = ASSETOWNER (must be exact all caps, one word)
E-tag Physical Path MISO TP line Misc Info: Token = ASSETOWNER (must be exact all caps, one word) Value = Customer Code to be used with Market Settlements

5 Questions? Please contact Interchange and Transmission Services at


Download ppt "Tagging a Network Scheduling Right"

Similar presentations


Ads by Google