PLAN with the PRIORITY GRID

Similar presentations


Presentation on theme: "PLAN with the PRIORITY GRID"— Presentation transcript:

1 SP Support Center Presents Working with the Priority Grid With Corina Tracy

2 PLAN with the PRIORITY GRID
ASSESS LEARN ASPIRE ACT PLAN

3 ASSESS to ASPIRE alone work well with operational variance
LEARN ASPIRE ACT PLAN

4 Start with ASPIRE for Strategic Planning, then ASSESS
OPERATIONAL PLANNING STRATEGIC PLANNING

5 the priority grid A Year-Round Tool Aiding Team Alignment Managing Up and down

6 Org & PROGRAM-LEVEL Scales up Scales down Pillar-level

7 Topics Covered What is the purpose of the priority grid?
What are the action implications? Mechanics for creating the grid How to force rank initiatives Pillar-specific strategy and metrics  Overall program-level strategy and metrics

8 Purpose Structure thinking to focus on high impact

9 The Priority Grid Axes Difficulty Organizational Impact 7.0 and above
6.0 – 6.9 4.0 – 4.9 3.0 – 3.9 Below 2.9 Below 6.0 6.0 – 6.4 6.5 – 6.9 7.0 – 7.4 7.5 – 7.9 8.0 – 8.4 8.5 – 8.9 9.0 and above Organizational Impact

10 The Priority Grid Quadrants
Difficulty 7.0 and above 6.0 – 6.9 4.0 – 4.9 3.0 – 3.9 Below 2.9 Below 6.0 6.0 – 6.4 6.5 – 6.9 7.0 – 7.4 7.5 – 7.9 8.0 – 8.4 8.5 – 8.9 9.0 and above FOOL’S TRAP HIGH HANGING FRUIT TEMPTING DISTRACTIONS LOW HANGING FRUIT Organizational Impact

11 Priority Grid Steps List Initiatives Force Rank Impact and Difficulty
Document Rationale Ground in Change-Sustain Strategy Action Plan

12 Step 2: Criteria for Forced Rankings
Time intensity/difficulty ranking, 1-10 Higher rankings based upon time intensity for key people Higher ranking based on degree of cultural (behavior) change required Higher if this requires resources ($’s, FTEs) not yet approved. Note if item is contingent upon needed resources. 7.0 and above 6.0 – 6.9 4.0 – 4.9 3.0 – 3.9 Below 2.9 Below 6.0 6.0 – 6.4 6.5 – 6.9 7.0 – 7.4 7.5 – 7.9 8.0 – 8.4 8.5 – 8.9 9.0 and above Impact ranking, 1-10 Based on what matters most in the context of a specific grid e.g. the overall vision, or the pillar element within it.

13 Step 2: What Forced Ranking is
7.0 and above 6.0 – 6.9 4.0 – 4.9 3.0 – 3.9 Below 2.9 Below 6.0 6.0 – 6.4 6.5 – 6.9 7.0 – 7.4 7.5 – 7.9 8.0 – 8.4 8.5 – 8.9 9.0 and above Ranking Individual Items AGAINST EACH OTHER

14 Step 3: Documenting Rationale each ranking
Evaluating Impact and Difficulty of Shifts How important you think an initiative area is

15 Step 3: Documenting Rationale helps…
…organize your thinking and… …encourage great conversations!

16 Bring Attention to the Level of Strategy you are Affecting
Program LEVEL 2 Pillar within a Program LEVEL 3 Strategy within a Pillar