1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.

Similar presentations


Presentation on theme: "1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio."— Presentation transcript:

1 1 Screen Shots

2 BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio

3 Operation Details Alternate and Additional Resource List of Operation- Resource for Selected Route Production Rate

4 Calendar Individual Resource Calendar Working Shift, Over Time, Non Working Shift

5 Workflow Running Production Plan

6 Sales Order Plan Explosion of BOM Considering both Material and Capacity Constraints Material Plan

7 Capacity Plan Capacity Plan in Minutes at Operation- Resource Level

8 Operation Plan Allocation Details for Work Order Operation Plan for Selected Work Order

9 Procurement Plan Generated Purchase Orders Proposed Sourcing Dates based on Production Plan

10 Resource Load Used Capacity by Available Capacity List of Resources

11 Individual Resource Load Capacity Attributes Load Graph with automatically balanced load

12 Critical Resource Load Between Two Dates

13 Inventory Report Ending on Hand at Different Dates List of Items

14 Item Status Item Status Between Two Dates

15 Problem Summary - Sales Order Late List of sales orders where Planned End Time is greater than due date and thereby late

16 Problem Summary – Shortage Report with Available Vs Required Date List of material where available date is greater than required date and shortage quantity

17 Automated Scheduling Automatically schedule all jobs for selected resource Automatically schedule or un- schedule a selected job Schedule all jobs for all resource either based on just-in-time or resource utilization strategy for given scheduling horizon

18 Interactive Scheduler Resource List Jobs list for the selected resource Non working time Schedule jobs Information on selected job in Gantt chart Zoom option Move timeline

19 Manual Scheduling Action on individual scheduled job Moving job through drag and drop or can be drawn on Gantt window While moving job, if there is violation, provides an alert

20 Upstream and Downstream Links Show upstream and downstream links for selected customer order or job order

21 21 Thank You