Removal of national particularities, PCS UG
15th May 2018, Vienna
2
National Parameters (Network Specific Parameters)
PCS, based on TAF/TAP-TSI schema, works with common set of parameters (26 for passenger, 35 for freight trains). These are designed to describe the train information, and path information necessary for the timetable construction and the path request process. Each IM/AB is invited to prepare its own network specific parameters. Purpose: required by the National Safety Authority (NSA) or company safety-related required by a Regulatory Body required by company needs (IT system) required by the Network Statement Other The problem is that the number of parameters started to grow dramatically in the past few years and the harmonization status among the IMs/ABs is critical. Activity type Location types Comment Loco type number Traction mode Train control system Train radio system Traction weight Traction length Traction max speed Traffic type Type of service Train weight Train length Weight of set of carriages Length of set of carriages Train max speed Planned speed Route class Max axle weight Brake type Minimum braked weight percentage claimed by IM Emergency brake override Braking ratio Braking weight Exception gauging ident Specific freight parameters Container profile Hazard Number RID Classification Dangerous Goods Volume Danger Label UN Material Number Weight of dangerous good Limited Quantity indicator Package groups
3
National Parameters (Network Specific Parameters)
Our target is reduce the number of National Parameters together with IMs/ABs as much as possible. However, if some exists, why do we need them in PCS? Without National Parameters in PCS With National Parameters in PCS 1 Common par. 3 Nat. par. 1 Common and national par. PCS PCS 2 National System 2 National System
4
National Parameters (Network Specific Parameters)
RNE Managing Board Telematic Cluster TTR IT WG TEG Planning Analysis of the situation Base of the analysis Result of the analysis Published National Parameters in PCS 12 IMs/ABs Ca. 150 kind of parameters (361 with all repetition and attributes) 15 main clusters and 11 sub-groups were identified A few examples: Requested information for additional technical data Organizational details Requesting service (supplementary, ancillary) facilities More detailed diversification of the train or the traffic type Etc. Details about the analysis can be found on the Sway link.
5
Parameters to… HARMONIZE DISCUSS REMOVE ADOPT
In case of partial interest, National Parameters should be harmonized among the creator IMs/ABs (name, format, validation, etc.) DISCUSS First National Parameter workshop, organized by PCS Team. Target is the removal/harmonization of National Parameters for TT2020 REMOVE National Parameters that are already part of the existing TAF/TAP-TSI or PCS schema should be removed by the IMs/ABs ADOPT In case of common interest, National Parameters should be added to the general TAF/TAP-TSI schema Short-term Short-term Mid-term Long-term