1 Project Management in Construction And Its challenges in Armenia

2 A recap of PMI’s standard project management processes

3 A simplified diagram - In construction, projects start by the owner with the business decision and ends will closure- check durations and milestones-In Armenia when there is an overlap-everything is messed up

4 Main Construction Project Management issues in Armenia
No project manager assigned at project initiation In most cases no project team Owner issues design RFP before defining the full scope Issuing Construction RFP with incomplete design documentation, flawed schedule and Cost estimations Economically unstable state of contracting companies Procurement issues in Armenia-Lack of materials immediate availability Poor or no stakeholder management/involvement/communication

5 Basic official formal communication

6 More detailed communication channels

7 Schedule Lack of proper schedule preparation even for large scale projects Preparing the schedule , not only job of planner, also project team

8 “I HAVE SO MUCH EXPERIENCE I DO NOT NEED A SCHEDULE”
When someone says: “I HAVE SO MUCH EXPERIENCE I DO NOT NEED A SCHEDULE”

9

10 Construction Project RISKS
In Construction, risk often arises during execution Contract Risks-Dangerous dramatic change in contract types HSE – Health, Safety & Environment risks

11

12 Is HSE followed in Armenia? Mandatory? Penalties?

13

14 Injuries and Fatal Falls mostly caused by

15 HSE practices in the US Adopt PtD (Prevention through Design) Adopt AHA (Activity Hazard Analysis) Think throughout the task, recognize hazards, assess the risks, control hazards

16 PtD (Prevention through Design)-Examples
Anticipate materials that may be stored on a roof during construction. Specify roof structure to support the dead load of construction materials. Design a safe fixed ladder minimize the need of portable ladders Specifying holes in columns above each floor slab make it easy to install cable or wire perimeter cables.

17 Advanced Planning, Monitoring & Controlling through 4D BIM
BIM-Building Information Modelling A single 3D sharable data resource supporting to design and maintain a physical built facility Helps detect clashes between different technical domains during the design phase The model is exported to facility maintenance after construction is completed

18 Advanced Planning, Monitoring & Controlling through 4D BIM
4D BIM considers the time factor, and thus becomes a powerful monitoring tool 5D BIM , the cost factor is also considered By updating the design model dynamically in parallel with the construction progress it turns into a powerful forecast tool When problem arises , the BIM model already holds all the information needed for the PM team to come up with solutions

19 New technologies used for Monitoring & Controlling
Drone mapped images can define the precise amount of material excavated, monitor stockpiles, help inspections

20 Final Thoughts… Consider planning no matter the project scale
Having a construction schedule is not a waste of time Stakeholders are important Safety measures are a must not a luxury Using new technologies is not necessarily expensive

21 A Last Word… Einstein's definition of insanity: Doing the same thing over and over again and expecting different results