New Oil and Gas Drilling and Production Technologies
Radius Energy, LLC May, 2013
2
Growth in Horizontal Drilling in Recent Years
3
Horizontal Wells Horizontal wells are often better suited for developing layered , tabular deposits (resource plays) such as coalbed methane and shale Now well established, this process provides a lower cost resource development process . …………… But…………. Horizontal wells still often present unique drilling and production related problems. New technology may be available to further reduce the cost of drilling and producing horizontal wells.
4
PROBLEM 1 - Vertical wells have sump (“rat hole”) to place pump
Liquid separates in vertical section; falls to sump Sump is below producing formations; No fluid head pressure to hinder production Gravity Separation: Gas rises to surface Liquid falls into Sump (“Rat-Hole”)
5
BUT - Horizontal wells have no rat hole – Pump must be placed directly in production stream
Any gas production causes interference with pump’s ability to pump liquid Inefficient pumping causes liquid level to build; High bottom-hole pressure hinders production Gas Interference Pump is unable to “pump” gas – Fluid level raises
6
Sealing Device: CLOSED
SOLUTION: Selective create a seal below the pump to temporally form an isolated pumping chamber : Form seal Pump liquid Release Seal Normal Operation: Sealing Device OPEN Pump OFF Sealing Device: OPEN Pumping Cycle: Sealing Device: CLOSED Pump ON Sealing Device: CLOSED
7
PROBLEM 2 – Electric pump cable can become damaged when being installed in deviated well
Electric Cable exposed to damage Electric Submersible Pump (ESP)
8
SOLUTION: Use “Wet Connect” to install pump cable inside of discharge tubing after pump is in place. Pump-down plug pulls cable into tubing – even into horizontal sections
9
PROBLEM 3 – Solids may settle along bottom of horizontal well – Blocking flow or inlet to pump
Solids settle along bottom of well, blocking flow and inlet to the pump
10
SOLUTION: Slowly rotate tubing with eccentric tail joint to keep solids agitated and in suspension. Suspended solids removed from well along with other production liquids. Helically shaped tail-joint “wipes” the circumference of well bore to agitate solids
11
SUMMARY - A number of new technologies can be applied to aid in the deliquification of horizontal wells. Gas interference can be eliminated by cycling the pumping and gas producing periods. A number of tools and methods can be used to isolate the pump from the flow of gas. By setting the frequency of the pumping cycle to a relatively short interval of time, there is little effect to the performance of the well. For more information, please contact: Joseph A. Zupanick, PE Radius Energy Services, LLC (304)