Download presentation
Presentation is loading. Please wait.
Published byYenny Salim Modified over 6 years ago
1
I C A L I C A L DFME follow-up issue. Page. OPEN POINTS
Client: DELL Gate type : side Model: Berlin Tool type: Part name: NA Cavities: Part No.: C9415 DFM by: WeiYong Part image I C A L DFME follow-up issue. Integral Corrective Action List Page. OPEN POINTS SOLUTIONS / ACTION WHO 1 2 3 4 P.1 Plastic Flow Analysis Please confirm - DELL - OK 29/08 P.2 Gate Please confirm - DELL - OK P.3,4,5,6,7,8 Parting line Please confirm - DELL - OK P . 9 EJECTOR PIN POINT LOCATION Please confirm - DELL – MOVE TO SUIT GATE P.10 Slider P. 11 SUGGESTION Please confirm - DELL – NO CHANGE P.12 P.13 P.14 QUESTON CENTERED GATE PLACEMENT IS INTENDED TO KEEP CUSTOMER FINGERS AWAY FROM GATE AREA 1 - Date of opening (all dates in 2005) 2 - Date of beginning of action 3 - Date foreseen for validation 4 - Date of validation (closing)
2
Plastic Flow Analysis Plastic Flow Analysis
3
Gate One side gate
4
top View Parting Line
5
bottom View Parting Line
6
Right Side Parting line
7
Left Side Parting Line LEFT VIEW
8
back View Parting Line BACK VIEW
9
front View Parting Line
10
Ejector Pin Point Layout
EJECTOR SLEEVES
11
Cavity / Core / Slider / View
CAVITY SIDE GREEN ARROW CORE SIDE PINK ARROW SLIDER BLACK ARROW
12
Texture surface Which surface need texture?
Please provide 2D drawing!!
13
Suggestion All green surface need cut plastics 0.5° for cavity release. All red surface need cut plastics 1° for core release.
14
Cut plastics for side gate
Suggestion Reverse Notch and this view. Model is reversed to recommendations. This area. Cut plastics for side gate
15
Suggest change the R0.3 to R1
Concerns Here is too thick plastics , it will cause sink mark. R0.3 Suggest change the R0.3 to R1
16
Recommendations and Concerns
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.