1 Port of Long Beach DARRIN LAMBRIGGER, P.E., CCM
DIRECTOR, CONSTRUCTION MANAGEMENT DIVISION CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA SOUTHERN CALIFORNIA CHAPTER PORT NIGHT– SEPTEMBER 27, 2018

2 Construction Management Division Leadership Team
Cesar Larios Deputy Chief Harbor Engineer Middle Harbor Ramanjit Brar Assistant Director Lincoln Lo Deputy Chief Harbor Engineer Civic Center/Rail/CM Technology Adriana Ramirez Manager, Labor Compliance and Administration Peter Forsythe Deputy Chief Harbor Engineer Fire/Bldg/Land/On-Calls Vacant Deputy Chief Harbor Engineer Infrastructure Projects Rick Benson Chief Inspector

3 LEADING GATEWAY FOR U.S.-ASIA TRADE
PORT OF LONG BEACH . LEADING GATEWAY FOR U.S.-ASIA TRADE

4 WORLD’S 10TH BUSIEST PORT COMPLEX
PORT OF LONG BEACH PORT OF LOS ANGELES WORLD’S 10TH BUSIEST PORT COMPLEX *BASED ON 2016 CONTAINER CARGO VOLUMES

5 AMERICA’S 2ND BUSIEST SEAPORT
$180 billion in cargo SUPPORTING 1 IN 8 JOBS IN LONG BEACH AND 300,000 REGIONAL JOBS

6 HIGHEST IN PORT HISTORY 7.5 MILLION TEUs 2017 2006 2007 2015 2014 2016
2013 2008 2010 2011 2012 2009

7 E-COMMERCE REVOLUTION

8 TODAY, CUSTOMERS EXPECT TO GET WHAT THEY WANT, WHEN THEY WANT IT AND WHERE THEY WANT IT.

9 Most direct BETWEEN ASIA AND MOST OF AMERICA
CHICAGO SHANGHAI Most direct BETWEEN ASIA AND MOST OF AMERICA

10 BIG SHIP READINESS PIER A/SSA PIER C/SSA PIER T/TTI PIER E/LBCT
3 BERTHS 10 CRANES 50’ DOCKSIDE PIER C/SSA 1 BERTHS 3 CRANES 42’ DOCKSIDE PIER T/TTI READY FOR 20,000-TEU SHIPS BY 2020 3 BERTHS 14 CRANES 55’ DOCKSIDE PIER E/LBCT READY FOR 22,000-TEU SHIPS BY 2019 3 BERTHS 14 CRANES 55’ DOCKSIDE PIER G/ITS READY FOR 14,000-TEU SHIPS NEAR TERM 3 BERTHS 17 CRANES 52’ DOCKSIDE BIG SHIP READINESS PIER J/PCT READY FOR 18,000-TEU SHIPS NEAR TERM 5 BERTHS 14 CRANES 55’ DOCKSIDE

11 CONTAINER VESSELS 52 FT DRAFT

12 LIQUID BULK VESSEL DRAFT 70 ft.

13 $4 BILLION CAPITAL PROGRAM

14 $456.5 MILLION CAPITAL BUDGET FY2018 ($millions)

15 $709 MILLION DRAFT CAPITAL BUDGET FY2019 ($millions)

16 LONG BEACH CONTAINER TERMINAL
State-of-the-Art, Greenest

17 = 10 FOOTBALL FIELDS! FINAL PHASE – Under construction

18 Investment in Rail Improvements
$1 BILLION Investment in Rail Improvements

19 PIER B ON-DOCK RAIL SUPPORT FACILITY

20 NEW LANDMARK $1.467 Billion Budget

21 15% of U.S. Imports Cross by Truck
BRIDGE REPLACEMENT 15% of U.S. Imports Cross by Truck

22 PREDICTABLE RELIABLE EFFICIENT FAST

23 CLEAN AIR ACTION PLAN

24

25 2035 ALL PORT TRUCKS ZERO EMISSIONS

26 ENVIRONMENTAL AND OPERATIONAL LEADERSHIP

27 Terminal Island Wye Rail Project Gerald Desmond Bridge Demolition
NRG Intake Demolition Terminal Island Wye Rail Project Gerald Desmond Bridge Demolition Fireboat Station 20 Construction Material Inspection On-Call Pier B On-Dock Rail Support Facility “Contractor/Vendor” Tab “Future Work” Link

28

29

30

31

32 2018 Harbor Cup Welcome Home!

33 Director, CONSTRUCTION MANAGEMENT DIVISION
DARRIN LAMBRIGGER Director, CONSTRUCTION MANAGEMENT DIVISION