Presentation is loading. Please wait.

Presentation is loading. Please wait.

MCAS Miramar Case Study AICUZ Seminar June 2016

Similar presentations


Presentation on theme: "MCAS Miramar Case Study AICUZ Seminar June 2016"— Presentation transcript:

1 MCAS Miramar Case Study AICUZ Seminar June 2016

2 Outline Location Installation History Mission and 3dMAW CP&L Function
AICUZ & Airport Land Use Commission (ALUC) Case Study 1: High Speed Rail Case Study 2: Stowe Trail Questions

3 SW Regional Range Complex Offshore Operating Areas
Marine Corps Air Station Miramar The Region: 85% USMC Live Fire Ranges 85% USMC Real Estate 67% U.S. military airspace Special Use Airspace Offshore Operating Areas

4 MCAS Miramar History Camp Kearny – 1917
U.S. Marine Airfield – 1946; Became NAS Miramar in 1952 & Master Jet facility shortly thereafter BRAC 1993 – MCAS Tustin and MCAS El Toro U.S. Marine Corps – Takes possession and renamed MCAS Miramar on 1 OCT 1997 U.S. Marine Corps – Fighter & Helicopter Squadrons began operating regularly over a period of time thereafter

5 MCAS Miramar Mission Our mission is to maintain and operate the facilities and provide services and material to support the operations of 3d Marine Aircraft Wing and other tenant organizations. - This is the mission of MCAS Miramar. - MCAS Miramar operates and maintains the facilities, buildings, hangars, the runways, all in support of our tenant organization – 3d Marine Air Wing - (3d MAW) who owns the aircraft. - To successfully accomplish the mission there are more than 10,000 military personnel and civilians who work aboard MCAS Miramar.

6 Community Plans & Liaison
Three divisions w/in department include Land Use (outside projects, AICUZ & REPI), Community Relations and School Liaison This office serves as the clearinghouse for off station land use issues and promotes family readiness objectives within academia.

7 AICUZ & ALUC History Established in 1976 Updated in 1992 (US Navy)
Updated in 2004 (Marine Corps) Planned update between Incorporate MV-22 and JSF Airport Land Use Commission (ALUC) MCAS Miramar Airport Land Use Compatibility Plan (Adopted 2008) City of San Diego (2011)

8 Noise Contours

9 Accident Potential Zones

10 Case Study: High Speed Rail
CA High Speed Rail Authority established in 1996 Numerous studies & various routes proposed California Bond Measure (Proposition 1A) (2008) Phase 1 and Phase 2 (LA - San Diego) (2030’s?) Have meet with them since late 1990’s Proposed three routes (2011) Proposed two routes (2016) Problems with all the proposed routes Tunneling???

11 Case Study: High Speed Rail
2016 Option #1 Mitigation Bank Option #2

12 Mitigation Bank Alternatives

13 Case Study: Stowe Trail
MCAS Miramar property on eastern boundary Historical trail leading from North SD County to downtown County of SD desire to acquire since 1993 Federal legislation approved in 2007; disagreement on price Attempts made to acquire property for lower price or free since then; all refused Issue lay dormant until 2016

14 Case Study: Stowe Trail
Trespassing issue over the years (Citations Issued) Decision made to impound bicycles in Jan 2016 Political backlash as a result 49 citations issued; all cases settled except one (as of May 2016) HQMC decision to allow civilian access (June 2016) MCAS Miramar staff in the process of determining how to achieve this objective

15 Case Study: Stowe Trail

16 Case Study: Stowe Trail
Fanita Ranch

17 County of SD Overview City of San Diego looking to expand West Sycamore County of San Diego looking to expand Goodan Ranch / Sycamore Canyon Preserve

18 Mission Trails Overview
City of San Diego looking to expand MTRP In the process of eliminating unofficial trails throughout area Also attempting to obtain parcels to the east of the landfill in order to establish a link to Goodan Ranch / Sycamore Ranch Preserve

19 Conclusions Engage early and often Monitor as much as possible Comment on all proposals

20 Community Plans & Liaison Officer
Questions? THANK YOU FOR YOUR TIME! Juan Lias Community Plans & Liaison Officer MCAS Miramar


Download ppt "MCAS Miramar Case Study AICUZ Seminar June 2016"

Similar presentations


Ads by Google