AWP Scalability The Acme Solar Project
2
Categorizing Small Projects based on familiarity
Type 1 - Solar Project/Valve Replacement Type 2 – Single Cycle Power Plant Type 3 – Debottlenecking Project 23/11/2018
3
The Owner Why this project? Why is it a type 1 project?
What is the contracting strategy? How will being a part of a program change things? How can this maximize value for the owner? We selected this project as sample of a Type 1 (familiar/similar) project. This project qualifies as a Type 1 because B&V execute solar project on behalf of owner’s like making cookies, the owner and location changes but the specification and technology is replicated The owner has elected to engage B&V on a EPC basis The POC/EWP/CWP/IWP are created once and are updated and reused on future projects Maximize value through repeating projects and repeatable business process. Predictible safety, quality, chang managemen, tcost and schedule. C. continuous improvement,
4
Working Session – Acme Solar
Kirk will take you through the Front End Construction Randy will walk you through Engineering and Procurement Kirk will then Discuss WorkFace Planning Ben will explain the new Scalable WorkFace Planning System Everyone will receive an electronic copy of the handouts 23/11/2018
5
Implementation Based on Best Practice
Identify type 1 projects Review to determine best practice Determine optimal approaches Contract Strategy POC WBS Schedule Construction Engineering Strategy Work Packaging WorkFace Planning
6
Looking for companies to Pilot
If you are interested in scalable AWP we would like to talk to you please leave us a business card or just let us know your interested 23/11/2018
7
Question and Answer