Download presentation
Presentation is loading. Please wait.
1
Structural Drafting Assignment S-4
2
Framing Plan Dimensions Beam designations End reactions
Title and Scale
3
Connection Detail-A Beam designations Center to Center dimension
Gage outstanding leg (GOL) dimension Cope cut dimensions (Q2 and Q1) Hole spacing dimension Assembly clearance dimension (C) Setback dimension (1/2”) Edge distance dimension for 3/4” diameter fastener Title and Scale
4
Connection Detail-B Beam designations Center to Center dimension
Gage outstanding leg (GOL) dimension Cope cut dimensions (Q2 and Q1) Hole spacing dimension Assembly clearance dimension (C) Setback dimension (1/2”) Edge distance dimension for 3/4” diameter fastener Title and Scale
5
Shop Drawing (W18 x 60 Beam) Cope cut dimensions
Hole spacing dimension Assembly clearance dimension (C) Setback dimension (1/2”) Edge distance dimension for 3/4” diameter fastener Beam length dimensions Angle dimensions Gage outstanding leg (GOL) dimension Center to Center dimension Title and Scale
6
Shop drawing (W24 x 76 beam) Hole spacing dimension
Beam length dimensions Center to Center dimension The term Orthographic is derived from the word “orthos” meaning perpendicular or 90o
7
Shop drawing (W30 x 108 beam) Hole spacing dimension
Beam length dimensions Center to Center dimension The term Orthographic is derived from the word “orthos” meaning perpendicular or 90o 7
8
Erection Plan Beam designations Erection marks Title and Scale
9
Bill of Materials Each principle view has it’s own “point of sight”
10
General Notes
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.