CAIIB-RISK MANAGEMENT- ASSET LIABILITY MANAGEMENT – MODULE A
G.R.RAO, Faculty, IIBF 11/24/2018
2
BANKING BUSINESS ON 26.09.2008 figures in crores
DEMAND DEPOSITS 4,96,673 TERM DEPOSITS ,45, ,42,138 LOANS, CC,OD ,36,890 BILL FINANCE ,05, ,42,467 CASH : DEPOSIT RATIO = 9.91 CREDT: DEPOSIT RATIO =73.86 11/24/2018
3
BANKING BUSINESS Contd...
C R R : 9 S L R : 25 TOTAL 34 HOW BANKS MANAGE CREDIT & CASH TOTALLING % OF DEPOSITS BORROWING TO DEPOSITS: % 11/24/2018
4
PRESENT DAY PRORITIES NET PROFIT WHICH IS OPERATING PROFIT - PROV. & APPROPRIATIONS OPERATING PROFIT (OP) =INT. INC. + OTH. INC. NET.INT. INC.(NII) ALSO CALLED SPREAD = INT. (EARNED – SPENT) O.P. = (INT. EARNED – INT.SPENT) - OTHER (EXPNS. – INC.) 11/24/2018
5
NII AND NIM BANKS WILL BE INTERESTED IN NIM AND WOULD LIKE TO SEE IT GROW NIM MANAGEMENT IS MAINLY ASSET AND LIABILITY MANAGEMENT IT MANAGES ASSETS AND LIABILITIES TO IMPROVE NIM UNDER A GIVEN RISK FRAME WORK 11/24/2018
6
ASSET LIABILITY MANAGEMENT
ENSURE ACCEPTABLE NII / NIM AND LONG TERM IMPROVEMENT IN NET WORTH FOR A GIVEN RISK LEVEL INCLUDES PLANNING, ACQUIRING AND DEPLOYING FUNDS FOR ABOVE PURPOSE IT IS ONGOING PROCESS OF FORMULATING, MONITORING, REVISING AND FRAMING STRATEGIES RELATED TO ASSETS AND LIABILITIES 11/24/2018
7
ALM Contd… ENCOMPASSES MANAGEMENT OF LIQUIDITY AND INTEREST RISKS
AVOIDS VOLATILITY, HELPS PRODUCT INNOVATION AND COMPLIANCE OF REGULATIONS IN REGULATED ENVIRONMENT IT IS DAY TO DAY FUND MANAGEMENT FUNCTION ONLY 11/24/2018
8
ALM Contd.. FROM BALANCE SHEET ANGLE FROM P&L ANGLE SPREAD MANAGEMENT
RESERVE MAINTENANCE LIABILITY MANAGEMENT ASSET MANAGEMENT INVESTMENT MANAGEMENT CAPITAL MANAGEMENT LIQUIDITY MANAGEMENT FROM P&L ANGLE SPREAD MANAGEMENT 11/24/2018
9
ALM- FUNDS MANAGEMENT INCOME ON FUNDS LENT SHOULD BE MAXIMUM
EXPENSES ON FUNDS BORROWED SHOULD BE REASONABLE ENNSURING FUND AVAILABILITY IS LIQUIDTY MANAGEMENT AT REASONABLE COST IS INT. MGMT 11/24/2018
10
LIQUIDITY MANAGEMENT TO ENSURE SUPPLY OF NEEDED FUNDS FOR
EXISTING BUSINESS AND NEW BUSINESS TAKE CARE OF MIS-MATACHES IN MATURITIES OF ASSETS & LIABILITIES PROJECTS FINANCIAL STRENGTH TO SOCIETY AND BANKING SYSTEM WHICH IN TURN ENABLES EASY AVAILABILITY OF FUNDS AT REASONABLE COST 11/24/2018
11
HOW LIQUIDITY GETS AFFECTED
DUE TO REGULATORY CHANGES DUE MARKET CHANGES BOTH EXISTING AND POTENTIAL DUE TO CUSTOMERS’ ACTIONS DUE TO CRYSTALLISATION OF CONTINGENT LIABILITIES DUE TO NPAs BIG FRAUDS 11/24/2018
12
LIQUIDITY MANAGEMENT ESTIMATION OF SIZE AND TIME OF FUND REQUIREMENTS CORRECTLY PLANNING APPROPRIATELY IN ADVANCE CONSIDERING COSTS AT DIFFERENT TIMES ACQUIRE FUNDS AT OPTIMUM COSTS 11/24/2018
13
LIQUIDITY MANAGEMENT WHY CASH FLOW ESTIMATES CAN GO WRONG
DECREASE IN ANTICIPATED REALISATIONS BOTH PRINCIPAL & INT. INCREASE IN NPA LEVELS BEYOND ESTIMATES SUDDEN SPURT IN ASSET BEYOND BANK’S CONTROL 11/24/2018
14
LIUQUIDITY MANAGEMENT
TYPES OF RISKS IN LIQUIDITY MGMT FUNDING RISK NEED TO PROVIDE FUNDS FOR UNEXPECTED OUTGOINGS TIME RISK NEED FOR COMPENSATING NON REALISED SOURCES CALL RISK CRYSTALLISATION OF CONTINGENCIES 11/24/2018
15
FOREIGN CURRENCY LIQUIDITY MANAGEMENT- PROCESS
FINALISE STRATEGY (QUALITY& QUANTITY) FOR EACH CURRENCY OF EXPOSURE STIPULATE LIMITS FOR TOLERANCES REG. MISMATCHES IN DIFFERENT TIME BANDS LOAN TO DEPOSIT AND LOAN TO CAPITAL LIQUID ASSETS TO ST LIAB. MEASURE, MONITOR AND MANAGE LIQUIDITY 11/24/2018
16
LIQUIDITY MANAGEMENT IDENTIFICATION OF PRIMARY AND SECONDARY RESOURCES
DIVERSIFICATIONOF RESOURCES CRISIS SCENARIO STUDIES CONTINGENCY PLANNING 11/24/2018
17
DIFFERENT APPROACHES TO LIQUIDITY MANAGEMENT
STOCK APPROACH & FLOW A PPROACH IN FLOW APPROACH INFLOWS AND OUTFLOWS ARE MEASURED FOR DIFFERENT TIME BUCKETS AND UNDER DIFFERENT SCENARIOS LIKE NORMAL TIMES, BANK SPECIFIC CRISIS AND SYSTEMIC CRISIS AND FUNDING AVENUES IDENTIFIED 11/24/2018
18
RBI GUIDELINES GROUP LIKELY INFLOWS AND OUTFLOWS INTO DIFFERENT TIME BUCKETS AND PRESCRIBING MAX MISMATCH IN NEAR TERM BUCKETS 1 DAY 5% 2-7 DAYS 10% 8-14 DAYS 15% 5-28 DAYS 20% PERCENTAGES ARE MAX. FOR RESPECTIVE TIME BUCKET 11/24/2018
19
INTEREST RISK MANAGEMENT
RISK OF INT. INC. GETTING AFFECTED DUE TO EXTERNAL FACTORS ONLY MARKET INTEREST RATES AND REGULATORY INTEREST RATES IMPACT WILL BE ON BOTH ADVANCES AND INVESTMENTS LIQUIDTY AND INTEREST RISK ARE NOT EXCLUSIVE NOT ALL ASSETS OR LIAB. WILL BE IMPACTED 11/24/2018
20
INTEREST RISK MANAGEMENT
GAP OR MISMATCH RISK IT IS RISK DUE TO FUNDING OF ASSETS WHICH WILL REPRICE IN DIFFERENT PERIOD FROM THAT OF LIABILITIES BASIS RISK DUE TO DIFFERENT IMPACT ON ASSETS AND LIABILITIES IN THE SAME TIME BUCKET 11/24/2018
21
INTEREST RISK Contd… EMBEDDED OPTION RISK
INHERENT RIGHT WITH AN ASSET OR LIABILITY FOR REPRICING YIELD CURVE RISK OR RATE LEVEL RISK DUE TO CHANGES INITIATED BY REGULATOR/ MARKET FORCES VOLATILITY RISK SUDDEN VOLATILITIES IN MARKT. MORE IN CASE OF BORROWED FUNDS 11/24/2018
22
MEASUREMENT OF INTEREST RISK
GAP METHOD AND ANALYSIS GROUP RATE SENSITIVE ASSETS AND LIABILITIES INTO DIFFERENT BUCKETS STUDY THE IMPACT OF INTEREST CHANGES BOTH POSITIVE AND NEGATIVE ON THE NIM DURATION METHOD MODIFIED DURATION METHOD SIMULATION APPROACH STATIC AND DYNAMIC SIMULATION 11/24/2018
23
GAP ANALYSIS GAP IS + VE IF ASSETS > LIABILITIES
Δ NII = GAP * Δr ( CHANGE IN INT. RATE) NIM = NII / EARNING ASSETS(EA) GAP * Δr = ΔNIM * EA = NIM* EA * ΔC ΔC IS ACCEPTABLE CHANGE IN NIM WORKING BACKWARDS YOU CAN ARRIVE AT THE ACCEPTABLE GAP FOR AN ACCEPTABLE ΔC 11/24/2018
24
LIMITATIONS IN GAP METHOD
GAP MAY NOT BE AMENABLE TO CHANGE TO SUIT DESIRED ΔC PRESUMES THAT BOTH ASSETS AND LIAB. WILL BE UNIFORMLY IMPACTED DOESNOT TAKE INTO ACCOUNT TIME VALUE OF CASH FLOWS WHEN THERE IS SIGNIFICANT CHANGE EVEN THOSE WHICH ARE NOT TO BE REPRICED WILL BE REPRICED 11/24/2018
25
ADJUSTED DURATION IN THIS METHOD ASSETS AND LIABILITIES ARE GROUPED DEPENDING UPON THEIR EXTENT OF LIKELY IMPACT AND NOT INTO TIME BUCKETS BY ASSIGNING DIFFERENT WEIGHTS RATE ADJ. GAP = ∑ WAI* AI – ∑ WLI*LI 11/24/2018
26
MODIFIED DURATION MODIFIED DURATION (MD) IS USED TO STUDY THE CHANGE IN PRICE OF AN ASSET DUE TO A CHANGE IN INTEREST RATE MD = D/ (1+ r) AND PC = - MD* Δ r / 100 PC IS CHANGE IN PRICE AND Δ r IS CHANGE IN INTEREST RATE IN BASIS POINTS AND THIS IS USEFUL ONLY IN CASE OF SMALL CHNGES IN INTEREST RATES 11/24/2018
27
MANAGEMENT OF FOREX RISK
TRANSACTION EXPOSURE CURRENCY RISK IN SPECIFIC FOREX TRANSACTION BETWEEN EXECUTION AND SETTLEMENT TRANSLATION EXPOSURE CURRECNY RISK INVOLVED AT THE TIME OF REPORTING TRANSACTIONS AT THE END OF ACCOUNTING YEAR TO H.O. OPERATING EXPOSURE 11/24/2018
28
FOREX RISK MGMT. TOOLS FORWARDS FUTURES-CURRENCY OPTIONS SWAPS
MONEY MARKET INSTRUMENTS MONEYMARKETINSTRUMENTS CAN BE USED LIKE A FORWARD CONTRACT INMGMT. OF FOREX RISK 11/24/2018
29
RISK MGMT. IN DEALING ROOM
OPEN POSITION OVERNIGHT AND DAY LIGHT LIMITS STOP LOSS LIMITS CAP ON SIZE OF TRANSACTION 11/24/2018
30
TWO PRACTICAL PROBLEMS ON DURATION ANALYSIS
1. ASSETS AND LIABILITIES OF FMG FINANCES ALONGWITH THEIR DURATION AND INTEREST RATRES ARE AS PER GIVEN TABLE. IDENTIFY RISK SENSITIVEGAP AND NIM. DURING AFORECASTING PERIOD OF 1YEAR IF INTEREST RATES FALL BY 2 % WHAT WOULD BE IMPLICATION ON NIM 2. ABC BANK HAS EARNING ASSETS AMNOUNTING TO Rs 1980 CRORES AND THEIR NIM IS 4%. MANAGEMENT’S POLICY SAYS THAT A 2.5% DEVIATION FROM NIM IS ACCEPTABLE. BANK FORECASTS THAT INTEREST RATES WOULD INCREASE BY 0.75% DURING NEXT12 MONTHS. WHAT SHOULD BE THE GAP OF THE BANK IF THEY HAVE TO BE WITHIN THE GIVEN RANGE OF NIM 11/24/2018
31
OBJECTIVE QUESTIONS 1. THE NEED TO REPLACE NET OUTFLOWS DUE TO UNANTICIPATED WITHDRAWAL OF DEPOSITS IS KNOWN AS RISK. 2. THE NEED TO COMPENSATE FOR NON-RECEIPT OF EXPECTED INFLOWS OF FUNDS IS CLASSIFIED AS -----RISK. 3. CALL RISK ARISES DUE TO CRYSTALLISATION OF 4. MATURITY LADDERS ENABLES THE BANK TO ESTIMATE THE DIFFERENCE BETWEEN-----AND------IN PREDETERMINED PERIODS. 11/24/2018
32
OBJECTIVE QUESTIONS Q. THE INSTITUTION IS IN A POSITION TO BENEFIT FROM RISING INTEREST RATES WHEN ASSETS ARE ……………THAN LIABILITIES. A. LESSER. B. GREATER C. EQUAL D. HALF. Q. THE LIQUIDITY RISK ARISING OUT OF UNANTICIPATED WITHDRAWAL OR NON RENEWAL OF DEPOSITS IS CALLED AS A. FUNDING RISK. B. TIME RISK. C. MARKET RISK D. OPERATIONAL RISK. 11/24/2018
33
OBJECTIVE QUESTIONS Q.LIQUIDITY RISK ARISING OUT OF CRYSTALLIZATION OF LIABILITIES AND CONVERSION OF NON FUND BASED LIMITS TO FUND BASED LIMITS IS KNOWN AS A. CALL RISK. B. TIME RISK. C. OPERATIONAL RISK. D. MARKET RISK. Q. STOCK APPROACH OF MEASURING AND MANAGING LIQUIDITY RISK AND FUNDING REQUIREMENTS IS BASED ON A. LEVEL OF ASSETS AND LIABILITIES AND BALANCE SHEET EXPOSURE ON A PARTICULAR DATE. B. BASED ON STOCKS PLEDGED TO BANK IN CASH CREDIT ACCOUNT C. STOCK OF INVESTMENTS OF BANK. D. NONE OF ABOVE. 11/24/2018
34
OBJECTIVE QUESTIONS UNDER GAP METHOD THE NET FUNDING
REQUIREMENT IS CALCULATED BASED ON A. RESIDUAL MATURITIES OF ASSETS AND LIABILITIES. B. ACTUAL MATURITIES OF ASSETS AND LIABILITIES C. BOTH THE ABOVE. D. NONE OF ABOVE. Q. CASH INFLOWS ARISE FROM MAINLY: A. MATURING ASSETS. B. MATURING LIABILITIES. C. MATURING OFF BALANCE SHEET EXPOSURE. D. MATURING TIME DEPOSITS. 11/24/2018
35
OBJECTIVES Q. IF THERE IS SIGNIFICANT DEFICIT OBSERVED SAY AFTER 30 DAYS PERIOD OPTION AVAILABLE FOR BANK IS TO A. ACQUIRE AN ASSET MATURING ON THAT DAY. B. RENEW OR ROLL OVER A 30 DAY LIABILITY. C. ACQUIRE A LIABILITY MATURING AFTER 30 DAYS. D. NONE OF ABOVE. Q. PRESENTLY NUMBER OF SUB DIVISIONS IN 1-14 DAYS TIME BUCKET FOR STRUCTURAL LIQUIDITY ARE A. FOUR. B. THREE C. FIVE . 11/24/2018
36
OBJECTIVES Q. CAPITAL , RESERVES AND SURPLUS ARE SLOTTED IN WHICH TIME BUCKET IN STRUCTURAL LIQUIDITY STATEMENT: A. OVER 5 YEARS. B. OVER 3 YEARS. C. OVER 1 YEAR. D. OVER 6 MONTHS. Q. SAVING AND CURRENT DEPOSIT MAY BE TREATED AS VOLATILE PORTION UPTO A. 10% AND 15 % RESPECTIVELY. B.20% AND 30% RESPECTIVELY. C. 30% AND 40% RESPECTIVELY. D. NONE OF ABOVE 11/24/2018
37
OBJECTIVES Q. WHAT IS BASIS RISK: A. RISK THAT INTEREST RATE OF DIFFERENT ASSETS AND LIABILITIES MAY CHANGE IN DIFFERENT MAGNITUDES IS CALLED BASIS RISK. B. RISK RELATING TO BASIS ON WHICH LOAN IS SANCTIONED. C. RISK RELATED TO YIELD CURVE. D. NONE OF ABOVE. Q. ONE OF THE STRATEGIES FOR REDUCING THE ASSET OR LIABILITY SENSITIVITY COULD BE : A. INCREASE FLOATING RATE INSTRUMENTS. B. INCREASE FIXED RATE INSTRUMENTS. C. NONE OF ABOVE. D. ALL THE ABOVE. 11/24/2018
38
OBJECTIVES Q. HIGHER THE DURATION IMPLIES THAT A GIVEN CHANGE IN THE LEVEL OF INTEREST RATES WILL HAVE A. LARGER IMPACT ON ECONOMIC VALUE. B. SMALLER IMPACT ON ECONOMIC VALUE. C. NO IMPACT. D. NONE OF ABOVE. Q. DURATION WILL BE HIGHER IF A. LONGER THE MATURITY DATE OR SMALLER THE PAYMENTS THAT OCCUR BEFORE MATURITY ( COUPON PAYMENTS) B. SHORTER THE MATURITY AND HIGHER THE PAYMENTS THAT OCCUR BEFORE MATURITY ( COUPON PAYMENTS) C. NONE OF ABOVE. D. ALL THE ABOVE. 11/24/2018
39
OBJECTIVES Q. SHORT TERM DYNAMIC LIQUIDITY STATEMENT RELATE TO
A. MONITORING LIQUIDITY ON DYNAMIC BASIS OVER A TIME HORIZON OF 1-90 DAYS. B. MONITORING LIQUIDITY ON DYNAMIC BASIS OVER A TIME HORIZON OF 7-90 DAYS. C. MONITORING LIQUIDITY ON DYNAMIC BASIS OVER A TIME HORIZON OF DAYS. D. NONE OF ABOVE. Q. IN STATEMENT OF INTEREST RATE SENSITIVITY : A. ONLY RUPEE ASSETS AND LIABILITIES AND OFF BALANCE SHEET POSITIONS SHOULD BE REPORTED. B. ALL ASSETS AND LIABILITIES SHOULD BE REFLECTED. C. ONLY FOREIGN CURRENCY ASSETS AND LIABILITIES SHOULD BE REFLECTED. 11/24/2018
40
WISH U ALL SUCCESS IN EXAM
THANQ WISH U ALL SUCCESS IN EXAM 11/24/2018