SV-04 VALVE STATION LEAK INCIDENT PSC th March 2018

Similar presentations


Presentation on theme: "SV-04 VALVE STATION LEAK INCIDENT PSC th March 2018"— Presentation transcript:

1 SV-04 VALVE STATION LEAK INCIDENT PSC 2018 09th March 2018
BY P.K.SIVANANDAN CHIEF OPERATING OFFICER PETRONET CCK LIMITED KOCHI

2 Brief details of Petronet CCK Limited
09/03/2018 Brief details of Petronet CCK Limited Formed in 1998 as a JV company promoted by Petronet India Limited, BPCL, Kochi Refineries Limited and other financial institutions PCCKL laid km long Cochin-Coimbatore-Karur product pipeline during and commissioned in 2002. CCK pipeline has one pumping station and two delivery terminals Now, PCCKL is 100% wholly owned subsidiary company of BPCL

3 KARUR RECEIVING TERMINAL 292.189 Km
BPCL Tanks BPCL Tanks BPCL Tanks COCHIN IRUGUR KARUR 18” Line Line fill KLS (23554 MT) 14” Line Line fill KLS (8406 MT) IRUGUR TAP OFF POINT Km KARUR RECEIVING TERMINAL Km COCHIN PUMPING STATION

4 Pipeline Route and Elevation profile

5 09/03/2018

6 Leak incident sequence
09/03/2018 Leak incident sequence Multiproduct pumping (SKO/MS/SKO/HSD) commenced on 02/05/2009 On 5th May 2009 at hrs drop in pressure observed at SV- 04 (Ch:20.5 km) in SCADA Call from valve station location about leak at hrs Emergency shutdown taken at hrs Fire tender reached site at hrs and sprayed water PCCKL team reached at site and stopped leak at hrs

7 09/03/2018 Cause of incident

8 Minor impact on environment
09/03/2018 Minor impact on environment

9 09/03/2018 Investigation by COE

10 09/03/2018 Public reaction

11 09/03/2018 Public protest

12 Reaction from Political parties
09/03/2018 Reaction from Political parties

13 Discussion in Grama Panchayat Office
09/03/2018 Discussion in Grama Panchayat Office

14 09/03/2018 Restoration ERV was used to collect the oil water mixture and discharged into ETP of Kochi Refinery of BPCL Quantity of diesel was less than 300 litres No standing crops near the area No traces of oil in the wells of villagers No damage to property of PCCKL No product crisis to BPCL as pumping resumed next day after clearance from PESO

15 PESO recommendations implemented
09/03/2018 Round the clock security at valve station from next day onwards Ferrule type threaded joint with SS tubing replaced with flange joint with carbon steel piping Online alarm facility in SCADA with zero pressure HC detector with alarm facility in SCADA OWS connecting storm water drain with isolation valve Additional display board with contact numbers Notice to public displayed outside gate mentioning do’s and don’ts in case of an emergency

16 09/03/2018