Download presentation
Presentation is loading. Please wait.
1
CITRIS Building Projects
June 11, 2002 CITRIS Building Projects Carlo H. Séquin
2
Current Building Plans
#1: Cory Hall Rejuvenation: ==> Create some new space; ==> Make usable any poor space; ==> Most quickly yields project and surge space. #2: Citris II (Davis North Replacement): ==> Create some new space; ==> A brand new building; ==> Yields the bulk of new space! #3: Citris I (Soda Hall Extension): ==> As it is in the EIR it is mostly under ground; ==> Postponed for now.
3
CORY HALL Renovation North South
6
CITRIS II Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) Microfab Laboratory (20k asf) Distance Learning Facilities High-tech Classrooms Interdisciplinary Research Space A new focal point for COE Integrate with COE Master Plan
9
CITRIS II Site Cory Nav.Ar. Davis HMMB Hesse McLaugh. Mining C. Evans
10
CITRIS_2 Building Model (from NW)
Cory Hall Davis South MicroLab CITRIS_2 Naval Architecture Etcheverry North Gate
11
CITRIS_2 Building (from North)
Cory Hall Naval Architecture Hearst Avenue
12
CITRIS_2 Building (from West)
13
CITRIS_2, Entry Floor (F3)
14
CITRIS_2, Typical Research Floor
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.