Presentation is loading. Please wait.

Presentation is loading. Please wait.

X5 Milestone 6 Changes and Key Features

Similar presentations


Presentation on theme: "X5 Milestone 6 Changes and Key Features"— Presentation transcript:

1 X5 Milestone 6 Changes and Key Features
X5 Team 25 November 2018

2 Changes in summary Look and feel
Improved performance on changing dates and funder scheme (new server process) Menu changes (formatted reports now found in ‘Common’) Formatted reports - new Show report icon New place for setting your start page Screen can be split in two Project setup changes. Project dates fields no longer hidden and exchange rates can be entered (and shown) to 7 decimal points DA staff tab: salary total field moved. Approvers: Selecting costing from task list takes you to approval screen for that costing Validation: new zoom to where warning/error is on costing Funder tab: new funder decision status

3 Changes in summary cont.
Reset no. of records shown on Drafts tab Notes field - text size bigger Salary calculator now takes into account increments prior to start date Bug fixes Copy to new funder now retains rates and currency information Fixed ‘NaN’ issue on Wellcome Trust costings Off-scale grades starting salaries and increments for DI staff now showing if foreign currency being used No longer need to use ‘currency revaluation’ button in project setup if new exchange rates (just upload new file) Validate and submit issue fixed

4 But some new problems Calculation issues when costing DI staff by Person by period (so if need to cost different FTE within a project year either create multiple posts or provide average FTE within breakdown by year). Edit button has disappeared on Funder inflation rates tab when funder inflation is the same as University inflation. If you need to edit the inflation rates please contact the helpdesk. For those of you involved with award and post costings, the RPFs generated by Research Services will open on a previously hidden worksheet (Header info). Just ignore this and look at the RPF1A etc.

5 Look and Feel

6 Menu: Reports now in Common (was called Information pages)

7 Opening formatted reports new Show report icon

8 Setting your start page
Setting your default start page now done through Your profile (against your initials in the toolbar at the top of the screen)

9 Split screen- new icon

10 Project setup: project dates no longer hidden and exchange rates to 7 decimal pts DA staff tab: salary total field moved

11 Changing proposed project dates and schemes New server process for changing proposed project dates and changing funder scheme in Project setup (for improved performance) Go to Your ordered reports to check the status of the job

12 Changing proposed project dates and schemes Go to ‘Your ordered reports’ then when status shows as ‘Finished’, go back to your costing and the dates will have changed

13 Departmental approvers/RS/RA: From tasks list- selecting a costing takes you through to approval screen for that costing

14 Validation- can now zoom to where error/warning is in costing

15 Funder tab: New funder decision status- withdrawn by applicant

16 Can reset number of records shown on draft tab

17 Notes tab Notes field increased in size. No longer edit field above


Download ppt "X5 Milestone 6 Changes and Key Features"

Similar presentations


Ads by Google