IGG Agenda – May 18th 2006 Minutes from last IGG meeting – 10.15

Similar presentations


Presentation on theme: "IGG Agenda – May 18th 2006 Minutes from last IGG meeting – 10.15"— Presentation transcript:

1 IGG Agenda – May 18th 2006 Minutes from last IGG meeting 10.00 – 10.15
Review of Action Items – 10.30 CER Update – 10.45 CER Update SEM Update Gemserv Update – 11.00 Market Operations Update – 11.30 Networks SEM Update – 13.30 Retail Market Design Service Update – 13.40 Market Design Update – 13.50 Version 5.1 Release of Market Systems Defect Resolution Requests Discussion Requests & Market Change Requests Cutover Plan for June Release – 14.00 TAG Update – 14.05 Next release of XML Schema Next Steps – 14.10

2 Minutes Minutes from last IGG meeting – April 6th 2006

3 Action Items Actions Addressed in Advance of Meeting
Update on Action Items Actions to be covered during remainder of presentation Actions to be carried forward Other Action Items

4 Actions Addressed in Advance of Meeting
Action Item 9 – Review sites moving from NQH to QH where 332 message is significantly delayed List of sites provided Follow-up indicated that sites where there was a very long delay with the 332 message were affected by various defects during 2005 Delay period has been reduced in 2006 and continues to improve No further feedback received Propose to close this item

5 Update on Action Items Action Item 11 – Review possibility of creating and providing test data for IPT Test master data can be created and provided MPs may need to assess IPT assurance requirements to see if creation of test master data is necessary and/or beneficial for June Release

6 Update on Action Items Action Item 7 – Provide update on date for data provision MCR 83 refers ISC are working on an interim data extract Interim data expected to issue before end of this week

7 Update on Action Items Action Item 2 – Draft process for handling the assurance of significant system changes Assurance strategy has been drafted Feedback from Market Participants has been incorporated See Gemserv presentation Propose to close this item

8 Update on Action Items Action Item 6 – Review requirement for connection agreement on CoS Action Item 8 – Advise IGG on proposals to resolve sites >= 100 kVA with no Connection Agreement Cleared with Networks Proposal now with CER See Networks Update later in presentation

9 Update on Action Items Action Item 4 – Review of objections process
Initial figures issued to CER

10 Actions to be carried forward

11 Actions to be carried forward
Action Item 7 – Prepare proposal on addresses in the retail market design Reviewing requirements for Technical Contact Address with ESB Networks Proposal on use of Notification Address close to being finalised

12 Actions to be covered during remainder of presentation
Action Item 3 – Document Procedures governing the allocation of MPRNs for TSO Connected Sites DR 0112 issued Amended DR will issue following feedback

13 Action Items raised TAG
Action Item 12 – Ensure release of version 5.1 for MPCC Single Installation Testing in progress Propose to issue MPCC Single Installation after June Release

14 CER Update

15 Gemserv Update

16 Market Operations Update

17 Agenda ESB Networks Update MRSO Update Retail Market Issues Update

18 ESB Networks Update Tom O’Donnell

19 Rural to Urban Reclassification Update
Run 3 to cater for residual Approx 3300 sites remaining mostly new connections Proposal with Networks business for handover of remaining sites and future changes New report to track new cases has run this week: 12,000 approx. further cases identified We will advise details to suppliers in near future

20 Proposal to CoS Issues for sites over 100 kVA
Action Items 6 & 8 refer Issue relates to 1,100 sites Networks have submitted a proposal to CER. If approved, Networks would: Write to all these customers advising: MIC and the general conditions of connection Allow 3 weeks for query If no query or signed CA in 3 weeks, agreement would be ‘deemed’ Update all 1,100 sites as having a Connection Agreement on the market system Proposal now with CER

21 Vulnerable Customers Initial meeting held between Networks business and ISC Changes for Vulnerable Customers more complex than originally envisaged: 4 attributes in the decision, each linked to a distinct set of DSO responses: Elderly Life support equipment Hearing impaired Visually impaired Outstanding issues currently awaiting resolution from Networks business before finalisation of Implementation Plan Next stage will be to issue revised Discussion Request

22 Frank Leetch – Manager MRSO
MRSO Update Frank Leetch – Manager MRSO

23 MRSO Erroneous De Registrations Sites Energised without Registration
Most sites now corrected One Supplier is seeking clarification from CER Need to retain as IGG item until resolved Sites Energised without Registration A small number of sites over 30 kVA were energised without a registration Networks have contacted the customers advising them of need to sign up with a Supplier 12 sites still not signed up and Networks are continue to follow up System Control to avoid a recurrence is now in place

24 MRSO Delays in Completing Registration of New Connections
We are currently investigating a small number of sites that may not have been advised as energised and so registration has not been completed We will also review the controls in this area with Networks to ensure that they are adequate Transmission Connected Sites Provision of data for 5 new sites unresolved PDS and Nat Grid in ongoing discussions

25 MRSO QH sites designated as NQH in SAP IS-U
Total number of sites that moved to QH in the May 06 tranche are as follows; PES - 300 IS - 44 There is a balance of approx 35 sites that we will move in the next tranche in July PDS Review complete and 723 sites identified Meter Asset Mgt notified and kits being sourced They will advise programme plan shortly Will be flagged as QH eligible on extranet

26 MRSO Annual Verification of Data – per MPD 15
PDS will have proposals on annual verification by 2nd June and will then agree with CER Note also that PDS have problems with validating data for a small number of sites where data is provided by Grid. Proposed long term solution is via SEM ??

27 MRSO Re Aggregation 13 Month Issue
February Re-Aggregation CD issued 12th May 13 Month Issue Mods Panel has made a decision (PM179) Detailed design work required from small project team to implement the changes

28 MRSO Consumption Adjustments MPD 17
These cover revenue protection and meter/time switch faults which are not automatically included in Aggregation Following the Mods Panel discussions there may need to be a revision to Agreed Procedure 03 Mods panel has agreed the following proposals consumption adjustments within 13 months will be advised to Settlement by a manual extract consumption adjustments greater than 13 months would be treated same as consumption outside 13 month window MRSO and SSA to meet and agree relevant procedures

29 MRSO MRSO Market Audit Scope Awaiting formal approval by CER

30 MRSO Load Factor Changes Reducing in volume: Nov 05 – 1684
Jan 06 – 997 Mar 06 – 456 May 06 – 268 Expect to stabilise around this figure

31 John Casey ESB Networks AIM Project Manager
SEM Update John Casey ESB Networks AIM Project Manager

32 Retail Electricity Market Issues Update
Brona McKnight, ESB Networks

33 Retail Electricity Market Issues Log
Log continuing to issue on a weekly basis Summary Statistics (as per last release – May 17th 2006) Total Number of Issues Logged 126 Total ‘Closed’ Total ‘In Progress’ 12 Total ‘Being Monitored’ 2 Total ‘Logged’ Issues Resulting in DRRs Total Raised Since Last Issue 0 Total Closed Since Last Issue 0

34 Retail Market Design Service Update
C. Madden, RMDS

35 Retail Market Design Service Update
Learning Point: Change of Supplier Read Arrangements A couple of Market Participants have submitted 010 messages in the recent past with Read Arrangement of SC or CR and a Required Date into the future Market Participants should not populate the Required Date where the read type is SC Market Participants need only populate the Required Date where the read type is CR and the reading is on the 010 message 010 messages with Required Dates well into the future will mean that the Change of Supplier process will wait until the date has been reached

36 Retail Market Design Service Update
Quality Review Internal review of quality processes as well as Market processes ongoing Stakeholder Meetings Initial contact made with some Market Participants to arrange meetings in the next few weeks Plan to be compiled following stakeholder meetings and submitted to CER following stakeholder meetings.

37 Migration of Market Design to new Process Modelling tool

38 Migration of Market Design to new Process Modelling tool
Working with Web Development team to create web-site to store V 5.1 In the short term all items will issue on CD Full Version 5.0 of Market Design to issue on CD today Full Version 5.1 of Market Design to issue on CD first week in June

39 Brona McKnight, ESB Networks
Market Design Update Brona McKnight, ESB Networks

40 Market Design Update Version 5.1 Release of Market systems
Defect Resolution Requests Discussion Requests & Market Change Requests

41 Version 5.1 release of Market systems

42 Changes Already Implemented
MCR 0050 – CoS readings process in loss scenario Changes Applied 8th May MCR 0061 – Addition of message tracking functionality to Extranet – Change applied March 30th

43 Version 5.1 release of Market systems
Schema release scheduled for June 24th 2006 The following MCRs have been approved for inclusion in the schema release

44 Version 5.1 release of Market systems
CR Description MCR 0064 TSO/SSA requirement for customer details on change from NQH to QH MCR 0065 Addition of Effective from date to 114 message MCR 0076 Addition of effective date of previous CoS to 102R message MCR 0077 Removal of GUID from webforms (no schema impact)

45 Version 5.1 release of Market systems– Documentation changes only
CR Description MCR 0072 Proposed modifications to MPD 15 MCR 0074 New MPD – Change of Group MPRN DRR 0098 Addition to comments on data codes

46 Future release of Market systems
Proposal to release a number of approved changes following the June release

47 Future release of Market systems
MCR Description Proposed Release Date Schema change MCR 75 Amendments to 501s message to facilitate Mod Panel resettlement decision 07.06 N MCR 70 Changes required to MPD 5 to cater for Management of QH Eligibility 09.06 MCR 68 Amendments to 501, 501S messages to only allow valid combinations of DLF Code & Load Profile 12.06

48 Future release of Market systems
MCR Description Proposed Release Date Schema change MCR 71 Change of metering from NQH to QH 12.06 N MCR 79 Proposed Solution to Actual CoLE reads being replaced by estimates where poor read history MCR 78 Add validation to use of Registered Company Number 03.07 Y Note: March 2007 is current working date for next schema release. AIM requirements may impact on this date.

49 Future release of Market systems
All other MCRs may be re-prioritised by Suppliers for inclusion in a later release

50 Discussion Requests, Defect Resolution Requests & Market Change Requests

51 Discussion Requests

52 New Discussion Requests
DR0111 Text to be added to MPD 14 to cater for Standard Profile Changes DR0112 New MPD 37 New Generator Transmission Connector DR0113 SoLR Process

53 New Discussion Requests
DR 0111 Text to be added to MPD 14 to cater for Standard Profile Changes Raised by: Retail Market Design Service It is proposed to include supporting information in MPD14 - Readings Processing - Non QH Meter section 3 Supplementary Information as follows: 'Whenever any standard profile change occurs that is not concurrent with the billing of a settlement relevant reading, then the first settlement relevant reading following the change will give rise to two AUFs, each of which is calculated pro-rata according to theload profile applying before and after the effective date of change.' Limited Feedback received – OK to progress to MCR?

54 New Discussion Requests
DR 0112 New MPD 37 New Generator Transmission Connector Raised by: Retail Market Design Service NEW PROCESS (MPD 37 NEW GENERATOR TRANSMISSION CONNECTOR) REQUIRED TO DOCUMENT THE PROCESS FOR THE NEW CONNECTION OF A QH METER POINT TO THE ESB NATIONAL GRID (TRANSMISSION) SYSTEM. Following feedback amended DR to issue

55 New Discussion Requests
DR 0113 SUPPLIER OF LAST RESORT (SOLR) Raised by: ESB Customer Supply CER has issued a final direction on the Supplier of Last Resort (CER 06/006). ESB Customer Supply have been appointed by CER to provide a SoLR function for the Irish electricity market. SoLR takes effect when a supplier exits the market and the customers supplied by the exiting supplier will revert to the SoLR unless they apply to an alternative supplier. Following Feedback, further Clarification Required from CER

56 Defect Resolution Requests
- DRR 0103 Removal of Redundant codes from Market Design - Raised by: Retail Market Design Service Amend the Market Design so that the following 2 code values for DUoS Group are not associated with NQH Sites: DG5A - LV Non-Domestic Non-MD Autoproducer DG6A - LV MD Autoproducer Amend the Market Design so that Autoproducer sites are only associated with MCC11 and not MCC10 and MCC68. Remove references to the following DUoS Group as it is no longer needed in the Market Design DG4 – Un-metered Amend the Code description of DG3 from Public Lighting to Un-Metered to reflect the types of site currently included in this category. Remove MCC68 as this is now a redundant code in the Market Design.

57 Change Requests MCR 0084 Business Rules for Estimation and Substitution of QH Meter Data to be added to MPD 15 MCR 0085 Section 10 Data Format & Character Set MPCC Technical Manual in line with Schema Next Steps?

58 Cutover Plans for June Release
B McKnight, ESB Networks

59 Cut Over Deliverables Information Points
Document “Market Approach to Cutover” to issue this week. This outlines the key milestones and timings for the cutover. New CD containing the release [XML Schema, Webforms] will be sent out on This CD should be used for the release on Saturday 24th June. Market Participants to confirm whether or not they have received the CD. Market Participants partaking in release on Saturday 24th June to confirm the contact name and contact numbers for the day. Market Participants must not apply the software release (from CD) to their production MPCC until first contacted by an Networks representative on the day. Information Points Old messages (23rd June or earlier) which are changing during the release can not be re-sent after the schema release. Old messages (23rd June or earlier) which are not changing during the release can be re-sent after the schema release. Market Participants to ensure that MPCC is switched on over weekend 24th June As with any release, timings may change on the day. 24/11/2018

60 Cut-Over – (Pre Cutover)

61 Cut-Over

62 Cut-Over

63 Cut-Over

64 Recovery Plan

65 If the decision is ‘No Go’,
Note: Step 13. If the decision is ‘No Go’, NW will work to resolve the issue during the remainder of Saturday. In this case, there will be a further Go/No Go decision notified to the market at 09h00 on Sunday 25th of June. If the decision is ‘Go’ Step 14 (schema upgrade and 999 message) will be rescheduled to 09h00 on Monday MOIEX support will be available for this. Steps will follow immediately afterwards.

66 TAG Update O Delaney, ESB Networks

67 MPCC Upgrades MOIEX have confirmed that all MPs are at MPCC v11
Focus is now on release of v5.1 in June MOiEX plan to roll out test MPCC v12 to Market Participants next week in advance of IPT Testing

68 Next schema release Finalised schema content as per Market Design Update V5.1 of the schema issued for test purposes Level of Market Assurance has been determined by Gemserv and circulated to Market Participants

69 Planned outages Bi-monthly data archive will take place in early June
All messages sent to or from the market gateway will be processed once the archiving is completed

70 Next Steps Proposed Diary dates for subsequent meetings June 22nd
August 10th September 21st

71 Next Steps Propose to continue with conference call every two weeks – proposed dates June 1st June 15th Call details will remain the same: Number: PIN : Contingency number remains: PIN: 60236


Download ppt "IGG Agenda – May 18th 2006 Minutes from last IGG meeting – 10.15"

Similar presentations


Ads by Google