Download presentation
Presentation is loading. Please wait.
Published byHengki Teguh Budiono Modified over 6 years ago
1
TAILWATER PREDICTIONS FOR THE LAKE BRAZOS DAM
GIS IN WATER RESOURCES FALL 2004 BY JACOB YOUNG HYDRAULIC ENGINEERING, USU
2
PROJECT SCOPE
3
PROJECT SCOPE
4
PROJECT SCOPE
5
OBJECTIVES PROVIDE INSTREAM FLOWS FOR THE BRAZOS RIVER AT THE TAILWATER OF THE DAM USE THE SCS CURVE NUMBER APPROACH IN GIS TO DO SO
6
SCS CN METHOD
7
FIRST STEP AQUIRE THE DATA ESTABLISH A PROJECTION NHD DATA DEM’S
LAND COVER SOILS PRECIPITATION ESTABLISH A PROJECTION
8
GIS ANALYSIS ISOLATE THE TEHUACANA CATCHMENT USING ArcHYDRO
9
GIS ANALYSIS CREATE CODING SYSTEM
10
GIS ANALYSIS CREATE CODING SYSTEM
11
GIS ANALYSIS ISOLATE LAND COVER RASTER DATA
ISOLATE SOILS POLYGON SHAPEFILE APPLY CODE SYSTEM CONVERT SHAPEFILE TO RASTER USING CODE FIELD SUM CODE FIELDS USING RASTER CALCULATOR
12
GIS ANALYSIS NOW HAVE ENCODED CURVE NUMBER RASTER
JOIN THE LOOK UP TABLE CONVERT RASTER TO POLYGON
13
GIS ANALYSIS ADD (S) FIELD TO POLYGONS CALC. VALUE WITH EQ.
CONVERT POLYGON TO RASTER USING (S) FIELD AS THE VALUE
14
GIS ANALYSIS APPLY PRECIPITATION DATA
RASTER DATA FOR THE 100 YR. STORM ISOLATE CATCHMENT PORTION USE RASTER CALC. WITH (S) VALUE AND PRECIP. RASTERS AQUIRE WEIGHTED FLOW ACCUMULATION USING ArcHYDRO
15
USING OUTPUTS TO CALC. INSTREAM FLOWS
WEIGHTED ACCUMULATION IS EQUIVALENT TO AQ TERM D – STORM DURATION Tc – TIME OF CONCENTRATION
16
QUESTIONS? THANKS TO: FREESE AND NICHOLS ENG. DR. TARBOTON
DR. MAIDMENT COLLIN ROBINSON
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.