Presentation is loading. Please wait.

Presentation is loading. Please wait.

MIME update RPWI Team Meeting, 10/11 January, 2011 Olivier LE DUFF

Similar presentations


Presentation on theme: "MIME update RPWI Team Meeting, 10/11 January, 2011 Olivier LE DUFF"— Presentation transcript:

1 MIME update RPWI Team Meeting, 10/11 January, 2011 Olivier LE DUFF
CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire de Physique et Chimie de l'Environnement et de l’Espace 3A, avenue de la Recherche Scientifique F Orléans cedex 02, France MIME update RPWI Team Meeting, 10/11 January, 2011 Olivier LE DUFF

2 Synthesizer principle (Based on AM²P/BEPI-COLOMBO)
command MEFISTO digital signal generator (sweden) synthesizer control electric antenna (japan) clock synchronous acquisition CPU signal analyser (FFT, phase…) signal acquisition (japan) (japan)

3 Important inputs for synthesizer
The following elements can have a big impact on synthesizer design: Who needs waveform generation (for calibration and/or for measurement). Frequency bandwidth: Fmin / Fmax. Frequency steps (∆F) and duration. Sinwave or other shapes (triangle, ramps…) ? Sweep or emission occurrence. Analog interfaces (number, level, impedance…). Synchronous emission/acquisition (absolute phase information). Will you need specific control of synthesizer ? (control frequency step, amplitude modulation…). Level of design integration.

4 Resources for BEPI (synthesizer only)
Mass: AM²P-E mass : 250 g (A5 size board without frame) Power: Need to have more inputs BEPI: <1W max.


Download ppt "MIME update RPWI Team Meeting, 10/11 January, 2011 Olivier LE DUFF"

Similar presentations


Ads by Google