Presentation is loading. Please wait.

Presentation is loading. Please wait.

Flood Hazard and Risk Map

Similar presentations


Presentation on theme: "Flood Hazard and Risk Map"— Presentation transcript:

1 Flood Hazard and Risk Map
Revised schema 18. March 2013 Floods Directive Reporting Drafting Group Meeting 12 atkins_ppt_new-3

2 Track changes since NOV12 meeting
An overview of changes on the basis of discussion at the November 2012 FD meeting and bilateral discussions between Commission and MS IPPC changed to IED to reflect new directive terminology

3 Track changes (2) - terminology
Element names changed to follow INSPIRE terminology Data -> FloodHazardMaps FloodHazardMaps -> HazardArea Scenarios -> QuantitativeLikelihood FloodRiskMap and ExposedElements added to differentiate between hazard and risk ** principle sketch

4 Track changes (3) – Overall structure
FloodHazardMaps changed from 1-1 to 1-many relation to accommodate several APSFR reported per UoM HazardArea changed from 1-1 to 1-many to accommodate QuantitativeLikelihood per flood type

5 Track changes (4) Summary
Summary3 changed to Summary3_1 to Summary3_5 in order to extract the correct information for the European map Summary4 changed to conditional as not all UoM are international

6 Track changes (5) The 'EU_CD_FL' changed to Identifier_HLP and made optional. EU_CD_HLP added with a 1-to-many relation which accommodate the set-up where more than one feature (spatial object) exists The 'DescriptionofProbability' element added

7 Track changes (6) Environment
The overall exposed element category changed from IPPCInstallations to Environment EnvironmentalConsequences added TypeofIEDInstallations made optional and NACE codes added as optional element EPRTR code added as optional element ProtectedAreas added as optional element

8 Track changes – to be discussed….
Medium probability as the required probability to report? Two optional elements added to be used in European FHRM - OverAll_Inhabitants and IEDInstallations in order to normalize data

9 Next steps… Finalization of schema Tools/guidance doc available and start of test phase End of test phase Final schema and tools ready

10 Questions?

11 Thank you! atkins_ppt_new-3


Download ppt "Flood Hazard and Risk Map"

Similar presentations


Ads by Google