1 Daily Drilling Report Phase 2
Project Meeting Pål Rylandsholm

2 Agenda Welcome [9:00] Approval of agenda
Approval of minutes from last meeting Project overview and overall status - DNV Report layout and updates to XML – Capgemini Updates to PSA's user guide and improved error messages - PSA License Web implementation - Tieto Conclusions and actions AOB Adjourn [13:00] © Det Norske Veritas AS. All rights reserved 24 November 2018

3 High lights All task have started
To enable efficient project execution and decisions, a core group has been established with the following participants: Jonas Stokka, PSA Ann-Christin Schili, LicenseWeb Bjørg Halsteinslid, StatoilHydro Geir Aas, ExxonMobil Arild Solsbak, ConocoPhillips Some issues that needs to be resolved regarding import to License web Need for additional information content have been identified © Det Norske Veritas AS. All rights reserved 24 November 2018

4 Status (not confirmed)
© Det Norske Veritas AS. All rights reserved 24 November 2018

5 Additional information requirements
DDR Phase 1 Operation codes Cement Period of operation “Drilling like units of measure” Formation name – selection list Datum (reference points) Casing type Pressurized coring Well stimulation (At well testing) indicator Perforation - Shot density RIGTYPE Bit data Side track Tight wells DDR Phase 2 Cost (ConocoPhillips) Report nr -> A sequence number. Each day of operation is a new number increment (ExxonMobil) Start date -> Start of reporting/operation (is prior to spud date) (ExxonMobil) Water depth (ExxonMobil) Bit record (additional info): grading, depth in, depth out, drill lenght (m), duration (hr), rop (m/hr) (ExxonMobil) Casing (new section): OD (in),top, bottom, weight, grade, estimated top of cement (ExxonMobil) © Det Norske Veritas AS. All rights reserved 24 November 2018

6 Document sharing PCA Trac – http://trac.posccaesar.org
Collabopration arena Document repository - SVN Project: Public: © Det Norske Veritas AS. All rights reserved 24 November 2018

7 © Det Norske Veritas AS. All rights reserved