Presentation is loading. Please wait.

Presentation is loading. Please wait.

ECHA Communications AP 7.1 March 2016 CA meeting Hugues Kenigswald

Similar presentations


Presentation on theme: "ECHA Communications AP 7.1 March 2016 CA meeting Hugues Kenigswald"— Presentation transcript:

1 ECHA Communications AP 7.1 March 2016 CA meeting Hugues Kenigswald
Biocides assessment Unit 17 March 2016

2 Content Status of biocides applications Disinfectant project
11/24/2018

3 Status of applications since EIO BPR*
INTERNAL 11/24/2018

4 Disinfectant project - description
Aim: to support evaluating Competent Authorities through developing a harmonised and coordinated approach for risk assessment of biocidal active substances used as disinfectants from the second priority list – PT 3, 4, 5 Duration: 12 months (Kick-off meeting 17/12/2015) Work packages (WP) covered by the contract: WP1: Preparation of instructions for evaluation of disinfectants WP2: Preparation of assessment and evaluation guidelines for efficacy of drinking water disinfectants (PT 5) WP3: Coordination of evaluating Competent Authorities WP4: Providing support to individual Member States

5 Disinfectant project - Contractor
Contractor: Dr Knoell Consult – working in close cooperation with ECHA Project Team Contact person: Madalena Bruto da Costa-Koch Expectations from the eCAs: nominate a contact person – ECHA will give access to Disinfectant Project folder on S-CIRCABC enable the Contractor to gather all necessary information – exchange of information should be done via S-CIRCABC indicate if one-to-one assistance in the evaluation of disinfectants is needed

6 Disinfectant project - benefits
streamline and harmonise the evaluation process by providing practical manual, guidance including concrete criteria and practical advice related to the most common problems encountered in the assessment of disinfectants Ad hoc scientific/technical support to eCAs for dossier evaluation – helps compensating insufficient or unavailable resources Facilitate the peer review with harmonised and comprehensive CARs delivered on time


Download ppt "ECHA Communications AP 7.1 March 2016 CA meeting Hugues Kenigswald"

Similar presentations


Ads by Google