Presentation is loading. Please wait.

Presentation is loading. Please wait.

Appendix: 2017 RTEP Report Key Graphics and Information

Similar presentations


Presentation on theme: "Appendix: 2017 RTEP Report Key Graphics and Information"— Presentation transcript:

1 Appendix: 2017 RTEP Report Key Graphics and Information
The following set of slides provides key information from PJM’s 2017 RTEP cycle. The slides are provided for the reader’s own communications needs.

2 Backbone Map

3 NERC Reliability Councils

4 Locational Deliverability Areas

5 Approved RTEP Projects (December 31, 2017)
NOTE: The PJM Board authorized on February 14, 2018, more than $397 million of additional transmission system enhancements identified by PJM and reviewed with TEAC stakeholders in This brings PJM’s total to more than $35.4 billion since 1999.

6 Approved Baseline Projects by Voltage – 2014-2017 (Approval Year)

7 Baseline and Supplemental Projects (2014-2017 approval years)

8 Summer Peak Load Forecast Comparison (2016-2017)

9 10 Year Summer Peak Growth Rate Comparison 2013-2017

10 Existing Installed Generation (CIRs, December 31, 2017)
As of Jan 31, 2017

11 Queued Generation Fuel Mix- Requested Capacity Injection Rights (December 31, 2017)
NOTE: Nameplate Capacity represents a generator’s rated full power output capability.

12 Queued Generation Progression – Requested Capacity Rights (December 31, 2017)
Historically, 11 percent of generation interconnection request megawatts reaches commercial operation.

13 Existing Capacity as of December 21, 2017 vs
Existing Capacity as of December 21, vs. Future Capacity for June 1, 2023


Download ppt "Appendix: 2017 RTEP Report Key Graphics and Information"

Similar presentations


Ads by Google