Utility Considerations on Transportation Projects
Charon Williams, E.I.T., CTCM Sustainable Civil Infrastructure Management & Planning Conference /16/2017
2
WHOOPS!
3
Project Development Process
Overview Project Development Process Utility Accommodations Strategy Design Considerations Q&A
4
Project Development Process
5
Utility Accommodations Process
6
Utility Accommodations Strategy: A – M – A
Avoid Minimize Accommodate
7
Utility Accommodations Strategy: A – M – A
Roadway C ROW Line Avoid Example
8
Utility Accommodations Strategy: A – M – A
Roadway C ROW Line Minimize Example
9
Utility Accommodations Strategy: A – M – A
Roadway C ROW Line Accommodate Example
10
Design Considerations – Utility Accommodation Rules (UAR)
11
Design Considerations – Utility Accommodation Rules (UAR)
§21.37(b)(3) New utility facilities crossing the highway shall be installed at approximately 90 degrees to the centerline of the highway.
12
Design Considerations – Utility Accommodation Rules (UAR)
§21.40(c)(2) – Underground Utilities (Water lines) The minimum depth of cover shall be 30 inches, but not less than 18 inches below the pavement structure for crossings. L Roadway C ROW Line Longitudinal Water Facility 20”
13
Design Considerations – Buy America Compliance
14
Buy America Compliance - Foundation
Set forth in both the 23 USC 313 and 23 CFR Requires that “all contracts eligible for assistance under this chapter for a project carried out within the scope of the applicable finding, determination, or decision under the National Environmental Policy Act of 1969 (42 U.S.C et seq.), regardless of the funding source of such contracts, if at least 1 contract for the project is funded with amounts made available to carry out this title.”
15
Buy America Compliance
Buy America Compliance Is Not Optional Utility work that qualifies for reimbursement, based on compensable property interest, cannot be excluded from Buy America compliance requirements
16
Buy America Compliance
Original Guidance Certain utility structures and component materials, when composed of more than 90% steel or iron by weight, are subject to BUY AMERICA compliance:
17
Buy America Compliance
Original Guidance Poles, cross arms, structural support members Towers and girders comprising transmission towers & stand-alone structures Conductor support cables High-strength bolts used as anchor bolts and anchor rods Iron or steel baseplates Encasement pipes, pipes and valves Rebar & other reinforcing iron/steel for all cast-in-place and precast installations Conduit and ducting Fire hydrants Manhole covers, rims, and drop-inlet grates
18
Buy America Compliance
Revised Guidance – Effective June 19, 2017 *ADDS* Certain utility structures and component materials, when composed of 100% steel or iron, are subject to BUY AMERICA compliance: Assembly Materials (miscellaneous steel) Attachment materials Housing encasements Fittings Miscellaneous electronics Miscellaneous hardware
19
Additional Legislative Requirements
SB 1289 Effective September 1, 2017 Iron and Steel products to be used on state-funded projects Amends Texas Government Code Amends Texas Transportation Code
20
Design Considerations - Other
Design phase engineering & consideration for compliance concerns Additional Thickness of Pipe Joint Occupancy of Poles Coating & wrapping of Utility Lines Spare Conduits or Ducts Utility Facilities on Highway Structures Cathodic Protection of Utility Lines Taller Poles Existing Facilities Remaining in Place
21
Summary
22
Utility Considerations on Transportation Projects
Summary A-M-A UAR Utility Considerations on Transportation Projects Buy America & SB 1289 Other
23
Questions/Comments
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.