Download presentation
Presentation is loading. Please wait.
Published byJosephine Warner Modified over 6 years ago
1
The New Bay Bridge Eastern Span Yerba Buena Island To Oakland
Greg Gotimer, Kerim Eken
2
2 Parts of the Bay Bridge Eastern Span Western Span
3
Old Eastern Span Opened in 1936 Steel Truss 2 Decks
You can see the construction of new skyway besides the old bridge
4
Loma Prieta Earthquake of 1989
Caused Partial Collapse of the Eastern Span of the Bay Bridge
5
Proposed Span Self Anchored Suspension Span
Single Tower Separate decks Suspension cable anchored into deck
6
Tower composition Shear Links
7
Flow of Forces Forces in final bridge Construction difficulties
8
Future of the Project Financial Issues
Proposed solutions to financial woes
9
Causeway (most likely)
Possible Bridge Types Causeway (most likely) Cable-Stayed Self-Anchored Suspension
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.