Download presentation
Presentation is loading. Please wait.
Published byTyrese Ming Modified over 10 years ago
1
Inspected in port Shanghai from 26th to 28th Sept. 2013 by NCL
MV BERING ID Inspected in port Shanghai from 26th to 28th Sept by NCL
2
Forward side view accommodation ladder
After view port side ship’s hull view
3
Port side Load line mark view
Isolating valve inspected in order Fresh water filling pipe secured
4
After winch well maintained After winch clutch level securing pin in place
After mooring line well maintained poop deck garbage station
5
Poop deck bulkhead cracked coating Oxygen bottles well stored
Well treated by ground and touch up Air pipe valve hand wheel corroded s main deck in way of No.5 ch well maintained
6
No.5 H s coaming view log stanchion s of no.5 hold maintained
Main deck s of No.5,4 H well maintained step in cross deck of No.5,4 corroded
7
No.4 mast house view No.5 CH condition
No.5 cargo hold condition
8
No.5 cargo hold condition view
9
No.5 cargo hold condition view
10
No.4 cargo hold condition view
11
No.4 cargo hold condition view
No.4 H s coaming well maintained No.4 H s main deck well maintained
12
S side bulwark well maintained cross deck no.3,4 partly rusted
No.3 H s comaing load stanchion s of No.3 h maintained
13
Log stanchion s of No. 3 H maintained bulwark stiffener s of No
Log stanchion s of No.3 H maintained bulwark stiffener s of No.3 H corroded No.2 cargo hold condition view
14
No.2 cargo hold condition view
15
No.2 cargo hold condition view
16
Cross deck No.2,3 partly rusted Main deck s of No.2 H maintained
Log stanchion s of No.2 H well maintained Main deck s of No.2 H well maintained
17
Main deck s of No. 1 H well maintained log stanchion s of no
Main deck s of No.1 H well maintained log stanchion s of no.1 H well maintained Cross deck fore of No.1 H partly rusted Star board side windlass view
18
Port side windlass view forecastle deck maintained
Forecastle deck maintained Echo sounder in good order
19
Dewater system control panel Autopilot station in order
Accommodation stair conditoin officer washing machines station in order
20
Ship office condition officer bathing room
Office WC condition Office WC room condition
21
Galley room condition Galley room condition
Office mess room condition office mess room condition
22
Office room sofa condition accommodation alleyway
Crew WC crew bath device condition
23
Gymnasium view crew washing machines
Port side Life raft view Bridge deck starboard side view
24
Bridge deck star board view star board side life raft
Crew WC washing basin Crew staff bath device
25
Aux. Boiler top view Aux. Boiler top view
Engine Grounding machine in work shop ME top view
26
Incinerator view ME exhaust manifold
Spare parts store room spare parts store room
27
New purifier control panel new Al Cap purifier installed in May 2013
AE fuel oil flow meter ME fuel oil flow meter
28
New purifier feed oil pump Main air compressor
AE condition AE condition
29
AE tank top condition view AE condition view
AE tank top condition view ME port side scavenging deck view AE
30
ME area tank top condition view ME port side view
Bilge water pump and pipe view storm valve condition view
31
O.W.S condition view Engine room tank top condition view
OWS over boat valve ME port side view
32
Engine room MGP control panel Quick close valve control station
Aux. Boiler exhaust pipe wasted Engine room funnel condition Which repaired by ship staff
33
Funnel damper operation tested in order Engine vent damper tested in order
Batter for GMDSS in order life boat inspected in order
34
Life boat engine tested in order incinerator tested in order
Deck crane inspected in order crane in side in cleaning condition
35
Crane in side fire extinguishers to be inspected P side of No
Crane in side fire extinguishers to be inspected P side of No.1 H deck and stanchion maintained No.1 CH condition view
36
No1 cargo hold condition view
37
No.1 cargo hold condition view
38
No.3 Cargo hold condition view
39
No.3 cargo hold condition view
40
No.3 cargo hold condition view
41
No.3 H lower side view S side life boat launched in water
re Deck crane hook condition view ME exhaust valve reconditioned
42
ME exhaust valve seat reconditioned Sopep materials inspected in order
Deck crane slewing bearing measure tools Ship ready for departure
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.