Presentation is loading. Please wait.

Presentation is loading. Please wait.

CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Centre of Competence of CM CM like.

Similar presentations


Presentation on theme: "CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Centre of Competence of CM CM like."— Presentation transcript:

1 CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Centre of Competence of CM CM like a transversal process enabler for a distributed but integrated PLM Mail: Twitter: Moi6_Martinez LinkedIn: Moises MARTINEZ-ABLANEDO Blog : cm-bits.blogspot.com Presented by Moises Martinez-Ablanedo / CM Expert

2 Bio – Moises MARTINEZ-ABLANEDO
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Bio – Moises MARTINEZ-ABLANEDO Personal Data Professional experience Aeronautical Engineering (2000) Industrial Organization Master Engineering (Polytechnic University of Madrid) Education Operational expertise in Product Identification, Change Process and Conformity management Definition of the Concurrent Engineering strategy to manage the design data flow between Engineering and Manufacturing Analysis and definition of PDM/MRP adaptations and new interfaces for the A380 programme Deployment of “business process driven” approach in CM CM R&T in Airbus Areas of Knowledge Aerospace Research Operational Configuration Management Design of PLM interfaces Process Architect for Product Identification Innovation & Research on CM field Main Bio hints Before 2002, Moises was working in the National Institute of Aerospace Research. From he joined Airbus’ Office in Madrid, starting in operational CM activities, he was finally leading several improvement activities in CM and PLM solutions for the A380 program. Awarded in 2005 and 2006 with three different Airbus Awards for Excellence in Quality and Efficiency categories. Appointed in member of the CM college of Experts, he moved to the Airbus’ Headquarter s in Toulouse and he undertook the role of CM process Architect. He started his new mission joining the concept plateau of new A350XWB program, in charge of the definition of the product architecture backbone. Currently is driving CM research activities in support of next generation PLM solutions. * Only to be filled for L5 proposals

3 AIRBUS The context “Welcome to AIRBUS” video:
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 AIRBUS The context “Welcome to AIRBUS” video:

4 A global company…. Madrid Sevilla Cadiz
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 A global company…. Madrid Sevilla Cadiz

5 1 global company 4 training centres …with global outreach
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 …with global outreach 20 languages 3 customer support centres > 7,000 aircraft delivered 5 spares centres 16 manufacturing sites But from these European roots, Airbus has grown into a truly international company …. 1 global company 3 customer support centres 4 training centres 5 spares centres 9 engineering design centres 15 manufacturing sites in Europe + 1 FAL in China 20 languages 24 hour customer support (365 days a year) 50 flight simulators 88 nationalities 160 offices 327 customers 290 resident customer support managers 348 operators More than 6000 aircraft delivered 52,500 employees 190,000 jobs supported in the US Airbus increasingly appreciated the advantages of a culturally diverse workforce, looking beyond its 12 engineering and manufacturing facilities in Europe to capitalise on the potential offered by a more global talent pool. Today Airbus has subsidiaries in North America, Japan and China, and has engineering facilities, spares centres and training centres across North America, China and Russia, as well as nearly 300 resident customer support mangers based with airlines around the world. In the near future it also plans to open new engineering and training facilities in India and a single-aisle final assembly line in China. >450 customers & operators 54,000 employees >80 nationalities 9 engineering design centres 250 resident customer support managers 4 training centres 160 offices 24 hour customer support (365 days a year) 50 flight simulators 1 global company

6 Centre of Competence of Configuration Management
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Centre of Competence of Configuration Management The framework

7 Configuration Management (CM) Definition
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Configuration Management (CM) Definition Wikipedia: “Configuration Management is a field of management that focuses on establishing and maintaining consistency of a system's or product's performance and its functional and physical attributes with its requirements, design, and operational information throughout its life .” ANSI (American National Standards Institute) in cooperation with EIA (Electronic Industries Alliance): "Configuration Management ... is a management process for establishing and maintaining consistency of a product's performance, its functional and physical attributes, with its requirements, design and operational information, throughout its life.“ ISO : “Configuration Management is a management activity that applies technical and administrative direction over the life cycle of a product, its configuration items, and related product configuration information.” Military Handbook

8 CM in Airbus WHY DO WE NEED CONFIGURATION MANAGEMENT IN AIRBUS
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 CM in Airbus WHY DO WE NEED CONFIGURATION MANAGEMENT IN AIRBUS Airbus produces several aircraft families A large range of options is proposed to the customers Not two aircraft are the same: customers choice and standard evolves continuously An aircraft is made up of thousands of parts made in different countries. Transport of A380 parts to the final assembly line in Toulouse Number of aircraft in service for each family A more and more complex Management: Airbus produces aircraft of a very high technology, with increasing manufacturing complexity and production rates. The number of parts and combinations of solutions grow with product complexity, as do the combinations of configurations to be managed. This is why configuration management has become a major activity in Airbus.

9 Distributed & Integrated PLM
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Distributed & Integrated PLM The presentation

10 CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Context & Rationale The business processes and current PLM solutions for the management of the product caused several disruptions that does not allow an efficient and smooth data flow and integration. Continuous data re-use is limited because of the segregated management among the different data domains among the different program phases. The aim of the presentation is to go thru the current issues and challenges to re-focus PLM innovation and process architecture into derived opportunities.

11 A complex technological product...
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 PLM for what? A complex technological product...

12 Data distribution Mechanical & Assembly definition
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Data distribution Mechanical & Assembly definition Functional definition System & Equipment definition

13 Different “reference assemblies” Different Data release rules
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Data distribution Different “reference assemblies” Different Data release rules Different certification process  Data synchronization and linkage based in complex and cumbersome methods

14 Data’s granularity and clustering is different
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Data evolution 8 concept definition industrialization In service Assembly concept A – trade 1 Assembly concept A – trade 2 Design Assembly  Version 2 Version 1 Installation Assembly 8 Issue A Spare Assembly kit Z Data’s granularity and clustering is different

15 Definition data “packs” cannot be re-used
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Data evolution Design Assembly  Inst. Assembly 1 Some bits of definition... Design Assembly  Design Assembly  Inst. Assembly 2 Inst. Assembly 4 Concept Assembly B Inst. Assembly 3 Design Assembly  Design Assembly  Concept Assembly A Definition data “packs” cannot be re-used

16 Data distribution and evolution
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Data distribution and evolution Industrialization & purchase concept definition In service Granularity and detail of data increases Granularity and detail of data increases Domains mechanical & assembly Impact of changes decreases Granularity and detail of data increases Systems & equipments Impact of changes decreases Detail of data increases functional Impact of changes decreases Program phases

17 Today PLM’s issues CM   PDM i concept definition industrialization
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Today PLM’s issues concept definition industrialization In service MRP (manufacturing & assembly) Post-delivery PDM (spares mngmt.) Architecture dossier PDM (requirements) Traditional PDM (mech. rules) Domains mechanical & assembly Traditional PDM (System rules) MRP (purchase) systems Traditional PDM (functional rules) functional CM   PDM i Program phases

18 but… what’s the process view?
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 The vision... but… what’s the process view? and… what’s the project management view? DISTRIBUTION link Program phases Domains concept definition industrialization In service mechanical & assembly systems functional Programme milestone Distributed and Integrated PLM Process interface INTEGRATION link CM =  i PDM

19 The re-engineered CM enablers
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 The re-engineered CM enablers Known Change Embodiment in the product architecture should enable an built-in data flow between different data domains Domains Configuration Architecture Module Common Product Identification and Structure should enable a continues data flow during the product evolution Program phases

20 What can be a re-engineered CM enabler? Common Product Identification
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 What can be a re-engineered CM enabler? Common Product Identification In the traditional product structure the objects are linked following rigid hierarchic links New product identification and sctructure may be based in the development of dynamical relations between data

21 Future challenges Removal of data structure patterns
CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Future challenges Removal of data structure patterns “Smart” data models What’s the fundamental bit of definition data Listening the voice of process owners & operators Simplification ... Your voice

22 CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS Operations S.A.S. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS Operations S.A.S. This document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, AIRBUS Operations S.A.S. will be pleased to explain the basis thereof. AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.


Download ppt "CM like a transversal process enabler for a distributed but integrated PLM - Moises MARTINEZ-ABLANEDO February 2012 Centre of Competence of CM CM like."

Similar presentations


Ads by Google