Retours d’Expériences sur les projets PLM du nucléaire dans les pays émergents
2
What are the challenges our BRICS customers say they face in nuclear Industry?
New Workforce Increasing Regulations Increasing complexity Increasing number of projects Technological dependencies Nuclear actors are facing a lot of challenges: - aging workforce with a very high challenge as the generation that brought to life the existing installations are retired or about to do so: strong challenge of keeping the knowledge + keeping the new hire - increasing regulation with an increasing need to have comprehensive demonstration and overall traceability asking for exceptional quality - increasing complexity as the technologies are evolving and as lessons learned is accumulated - increasing operational costs as a result of all the previous other trends - increasing competition of actors worldwide Those challenges are especially key when the operators don’t operate “as-is” but plan new builds or major refurbishments as this is during those difficult phases that the weaknesses of the organization may appear.
3
A growing competition in the Nuclear Industry
BRICS companies have no legacy: Willingness to re-use the best technologies of the “old world” Hand-free to innovate, to use new technologies and new processes Fair or unfair competition? Technology transfer Regulation? Growth
4
Business transformation for the Nuclear Industry
AS-IS TO BE from “paper” to “digital” from “silo-based” information to “collaborative” sharing from “traditional” engineering to “lean” engineering from “document centric” to “data & full digital mock-up” from “delay & cost overrun” to “on budget & on schedule” from “One Of” to “standardization / modularization” Not only a matter of helping solve internal challenges This is a matter of helping solve some business challenges and change the bottom line This is a matter of business transformation This is an enterprise solution
5
Build the Integrated Digital Plant Referential
Initiate the transformation with the 3DEXPERIENCE Platform TO BE to “digital” to “collaborative” sharing to “lean” engineering to “data & full digital mock-up” to “on budget & on schedule” to “standardization / modularization” Digitalization Control Structure Navigate AS-IS from “paper” from “silo-based” information from “traditional” engineering from “document centric” from “delay & cost overrun” from “One Off” Plant Breakdown Structures Data & Documents Requirements 3D Mock-Up Processes Execution. Collaboration Build a comprehensive referential of your plants and your products (fuel, steam generators, etc.) Have a free Navigation across the multiple Views of the Systems
6
Virtual Plant Model Benefits
Leverage the 3DExperience Platform to support end-to-end Plant Lifecycle Multi-discipline Consistency End-to-end traceability Full virtual Plant Model definition Systems Simulations and Validation Operation support Provides comprehensive enterprise solutions and not point solutions Keeps safety requirements as the reference Brings the best-in-class proven solutions and processes coming from aerospace
7
CNPE Adopts Optimized Plant Construction 3DEXPERIENCE Solution
CNPE is the EPC company who major focus on NPP construction Part of Business Value A single business platform with integration the legacy systems, ERP, P6, etc to have the real-time comprehensive project information Longer term ability to expand the system to manage the lifecycle of NPP from engineering, construction to operation support Solution 3DEXPERIENCE Platform Optimized Plant Construction 3DEXPERIENCE Solution
8
JNPC Adopts Safe Plant Operation 3DEXPERIENCE Solution
JNPC is an O/O with reactor type from ROSATOM technology Part of Business Value a single version of truth for asset by taking advantage of 3DEXPERIENCE Platform to integrate with SAP ERP and legacy system Longer term ability to support NPP maintenance with the foundation of plant asset information compliant with energy industry data model (SSC) and standards Solution 3DEXPERIENCE Platform Safe Plant Operation 3DEXPERIENCE Solution
9
NIAEP Nizhny Novgorod Engineering Company ATOMENERGOPROJECT
Russian leading EPC in the nuclear industry with over 4000 employees and over 7000 personnel including subsidiaries, executing currently 20 projects in Russia and abroad (30+% NNPP Market share) NIAEP and ROSATOM have launched significant investment programs to accelerate and deploy new applications and innovative processes, out of which DS PLM solutions were selected Challenges NPP construction time & costs Construction delays, Schedule shifts, costly resources idle time due to inaccurate planning (loses up to $1M per day) Faults from the low level of the construction technology lead to the costly updates (time & money) on construction site Lack of the experience from the side of the workers responsible for project critical operations; safeguarding of workers security at the construction site Values Reduce building duration, ability to build each new nuclear station block within 48 months Unified approach to nuclear plant construction to be prepared to build 20 new nuclear blocks Control time and control costs : deadline driven approach (Please read the slide)
10
NIAEP Global & End-to-end Digital Platform
Management Construction Procurement Engineering