1 New York City Master Plan Update

2 NYC Master Plan Goals Create a distinct identity for Lubin at 1 Pace Plaza – our flagship building Create a distinct identity for Dyson at historic 41 Park Row Create a new student center for student success Create a new exterior identity for 1 Pace Plaza Create new forms of learning and research spaces

3 Phase 1 - The Student Landscape
Address the first impressions of the campus, improve visitor and student experience Renovate first floor (west) of One Pace Plaza to create a new Student Union, study areas, and student commons; a new Welcome Center and Spirit Store; new Lubin branded entrance through the courtyard on B-Level with a Lubin learning lab and new Admissions Suite. Design renovations to the Plaza including stairs, ramps, plantings 9 Spruce Street Entrance 1 Pace Plaza – Lubin Lobby, Grand Staircase

4 Phase 1 - The Student Landscape
Renovate lower level and 1st and 2nd floors of 41 Park Row to create a new art gallery, student commons, Dyson advising suite and faculty colloquia 41 Park Row – 1st Floor Commons 41 Park Row – Art Gallery

5 Phase 1 – Construction Update
1 Pace Plaza and 41 Park Row curtain wall installation has been completed Terrazzo flooring is complete at 1 Pace Plaza Enrollment Management Suite - glass fronts and partitions is in place 1 Pace Plaza 1st Floor glass fronts and partitions are in place New stair and plaza construction is underway Fire Alarm Installation at 41 Park Row is underway. Fire installation in 1 Pace Plaza complete Ceiling lighting fixtures installation is in progress Courtyard pavers installation is complete Upcoming Milestones 9 Spruce Street Entrance changes Bowtie Ceiling Construction at 1 Pace Plaza 1 Pace Plaza Inspections AV, Signage and Furniture Installations

6 Phase 1 - Construction Schedule
Upcoming In Progress Completed

7 1 Pace Plaza, 1st Floor October 2018

8 1 Pace Plaza, 1st Floor, Student Union October 2018

9 1 Pace Plaza, 1st Floor, Study Nooks October 2018

10 1 Pace Plaza, Lubin Entrance October 2018

11 1 Pace Plaza, Lubin Lobby October 2018

12 Enrollment Management Suite October 2018

13 Enrollment Management Suite October 2018

14 41 Park Row 1st Floor Art Gallery September 2018

15 41 Park Row 2nd floor Lounge Area September 2018

16 41 Park Row 2nd floor Dyson Colloquia October 2018

17 41 Park Row 2nd floor Advising Suite October 2018

18 1 Pace Plaza, Entrance Change October 2018

19 Renderings Appendices

20 1 Pace Plaza Student Landscape

21 1 Pace Plaza First Floor Entrance and Donor Wall

22 1 Pace Plaza First Floor Student Center

23 1 Pace Plaza First Floor Student Commons

24 1 Pace Plaza First Floor Student Collaborative Study Area

25 1 Pace Plaza First Floor Welcome Center

26 1PP Lubin Lobby and Admissions Suite

27 1 Pace Plaza Lubin Entrance

28 Grand Stair connecting B level and 1st floor

29 One Pace Plaza Lubin Graduate Lounge

30 Lubin Virtual Lab

31 41 Park Row Exterior

32 41 Park Row First Floor and Lower Level

33 41 Park Row First Floor

34 41 Park Row Art Gallery

35 41 Park Row Second Floor

36 41 Park Row Second Floor – Dyson Commons