Download presentation
Presentation is loading. Please wait.
1
Draft 2018 Project Priorities
Sarasota/Manatee Metropolitan Planning Organization April 9, 2018
2
Continued Projects 2018 2017 Desoto Bridge River Road 15th Street East
Complete Streets Legacy Trail April 2018
3
Central Manatee Network Alternatives Analysis (CMNAA)
April 2018
4
Desoto Bridge April 2018
5
Barrier Island Traffic Study (BITS)
NORTH STUDY AREA SOUTH STUDY AREA Zone 1: Anna Maria Holmes Beach Zone 2: Coquina Beach Bradenton Beach Zone 3: Longboat Key St Armands Lido Key April 2018
6
Automated Traffic Management System (ATMS)
April 2018
7
Strategic Intermodal System (SIS)
April 2018
8
Road Safety Assessments (RSA)
April 2018
9
Partner Priorities April 2018
10
Discussion April 2018
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.