Presentation is loading. Please wait.

Presentation is loading. Please wait.

Case Study: Phase out of Perfluorinated Compounds

Similar presentations


Presentation on theme: "Case Study: Phase out of Perfluorinated Compounds"— Presentation transcript:

1 Case Study: Phase out of Perfluorinated Compounds
Anna Biverstål & Linn Farhadi, Global Chemical Compliance Experts H&M GROUP

2 About H&M Group GROUP

3 About H&M Group 69 markets 4,700 stores 43 markets 171,000 employees
More than E-Commerce in Over Sales including VAT SEK Profit after Tax SEK 43 markets 171,000 employees 232 billion FASHION and QUALITY at the best price in a SUSTAINABLE way billion

4 H&M Group – Phase Out of PFCs

5 Phase Out Timeline 2009 End 2010 Beg. Of 2013 Beg. Of 2016
Collaboration with chemical supplier to find alternatives Trial on fabric stage First product in store Ban of PFCs in all products Positive list published Recognition from consumer council 2009 End 2010 Beg. Of 2013 Beg. Of 2016

6 Collaboration and Trial on Fabric Stage
One of the alternatives investigated was BIONIC- FINISH®ECO supplied by Rudolf Group

7 2010 First PFC-Free Product In Store

8 2013 PFC Ban in all Products

9 Recognition from Consumer Council

10 Challenges and Opportunities
Collaboration is key for clean factory

11

12 LEADING THE CHANGE TOWARDS SAFE PRODUCTS AND A TOXIC FREE FASHION FUTURE

13 Chemical Management Roadmap

14 2018 Re-Launch of the Positive List

15 Together for a sustainable future

16


Download ppt "Case Study: Phase out of Perfluorinated Compounds"

Similar presentations


Ads by Google