Presentation is loading. Please wait.

Presentation is loading. Please wait.

C-PACE CASE STUDIES.

Similar presentations


Presentation on theme: "C-PACE CASE STUDIES."— Presentation transcript:

1 C-PACE CASE STUDIES

2 MAN Holdings Shaker West Professional Sustainability Project

3 MAN Holdings Strong building income, but hobbled by utility expenses
Shaker West Professional Sustainability Project Strong building income, but hobbled by utility expenses 3 year electric expenditure average $96,400 yearly 3 year gas expenditure average $ 26,350 yearly Gas and electric expense consumed over 30% of building income This building was acquired at an aggressive price because the expenses intimidated many buyers

4 MAN Holdings Expenditures $440,000
Shaker West Professional Sustainability Project Expenditures $440,000 Lighting Retrofit $75,000 HVAC Controls $68,000 Building Envelope: Window Caulking and Tinting $67,000 Solar Panels $230,000

5 Projected annual energy savings $64,200 Yearly PACE payment $39,000
MAN Holdings Shaker West Professional Sustainability Project Projected annual energy savings $64,200 cut utility expense by over 66% Yearly PACE payment $39,000 Net annual gain $25,200 Additional savings: one time utility and tax incentives $ 80,000

6 MAN Holdings Move the expense off P&L and Balance Sheet
Shaker West Professional Sustainability Project Move the expense off P&L and Balance Sheet PACE loans are a tax assessment, not a liability Improve the look, feel and marketing of building Sustainability sets you apart If I sell, the PACE assessment can follow the parcel A traditional loan would need to be paid off

7 MAN Holdings Shaker West Professional Sustainability Project Over 20 year period this project generates projected savings of about $600,000


Download ppt "C-PACE CASE STUDIES."

Similar presentations


Ads by Google