1 CMS Perugia Modules Production Review
tRACKER WEEK 21/07/1999 CMS Perugia Modules Production Review D. Benedetti, M.Biasini, E.Babucci, M.Giorgi, M. Nastase, M. Puscalau, V. Postolache, A. Santocchia, F. Velcea CERN Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

2 Marco Giorgi CMS Perugia
Outlook Modules productions Assembly precision Hybrids test Tools and Plates Gantry operations Available parts Cern Marco Giorgi CMS Perugia

3 Marco Giorgi CMS Perugia
Modules production tRACKER WEEK 21/07/1999 346 modules assembled from to 228 TIB R-phi L34 modules 118 TIB R-phi L12 modules 248 full rate (8 modules/day) 2 modules out of mechanical specs 336 modules shipped to bonding centres (Pisa, Padova) Vecchia presentazione Cern Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

4 Marco Giorgi CMS Perugia
tRACKER WEEK 21/07/1999 Modules production Dec 03 Apr 04 contingents Cern Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

5 Assembly Precision: gantry
tRACKER WEEK Assembly Precision: gantry 21/07/1999 cut cut cut cut cut cut Y Difference between design coordinate: Xmes - Xdes Vecchia presentazione X Cern Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

6 Assembly precision: gantry- CMM
Cern Marco Giorgi CMS Perugia

7 Marco Giorgi CMS Perugia
Hybrids test tRACKER WEEK 21/07/1999 449 Hybrids received from Cern 346 Assembled 17 sent back to CERN for evaluation before assembly 2 with problems on electronic 4 with scratches on pitch adapter 11 with bonds slightly bended 81 Stereo l/r received, under test Vecchia presentazione Cern Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

8 Marco Giorgi CMS Perugia
Tools and plates tRACKER WEEK 21/07/1999 Perugia take care the construction of TIB/TID assembly ad storage plates 2 storage plates for TIB, TID working (Perugia, Bari) 6 TIB R-phi assembly plates working (3 Perugia, 3 Bari) 2 Tib Stereo left plates ready 2 Tib Stereo right plates almost ready TID Layer 1,2 R-phi plates on work on industry TID Layer 3 R-phi plates technical drawings ready TID stereo plates: waiting for final frames drawing 24 hybrids pickup tools working (12 Perugia, 12 Bari) Vecchia presentazione Cern Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

9 Marco Giorgi CMS Perugia
tRACKER WEEK 21/07/1999 Tools and plates Vecchia presentazione Cern Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

10 Marco Giorgi CMS Perugia
tRACKER WEEK 21/07/1999 Gantry Operation Accurate = Time consuming operation Cern Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

11 Some scratches on sensors
tRACKER WEEK 21/07/1999 After some indications we have found some Tib ib1/2 modules with light scratched sensors. Action: optical inspection on microscope before and after assembly on gantry: Results: The assembly procedure do not introduce any scratch. Light scratches were induced by a vacuum pump used to handle TIB sensors during inspection after reception. This problem was fixed last December, but we are still mounting sensors that are affected by this feature. Vecchia presetazione Cern Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

12 Marco Giorgi CMS Perugia
Available Sensors Frames Hybrids Carriers TIB-Ib1 198 1 70 TIB- Ib2 TIB- S L 48 TIB- S R 33 TOT 82 Cern Marco Giorgi CMS Perugia = on Perugia QTC

13 Marco Giorgi CMS Perugia
Conclusions tRACKER WEEK 21/07/1999 Production started from dec-2003 Large fraction of modules rate Assembly precision under the specs Almost ready to assembly all TIB modules type Vecchia presentazione Cern Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA