Download presentation
Presentation is loading. Please wait.
1
Fabrication, Economics and Test Plan QDR
Team #3 Presented by Greg Davidson and Etan Karni
2
Scheduling Parts order: Done CDR: Thur. 3/24
Fabrication: Thur. 3/24 through Flight Readiness Review on Thur. 4/15 Flight testing: Thur. 4/15 through Mon. 4/18 Public flight demonstration: Tue. 4/19
3
Fabrication Plan
4
Pre-Flight Testing Sandbag wing Cycle landing gear Drop test
Verify CG location Check all surfaces for warps Check all controls for range of motion / binding Radio range check Tests conducted as parts are completed and installed
5
Flight Test Plan Low/Hi-speed taxi tests
Familiarize pilot with ground handling characteristics; crew with aircraft operations Flight 1A – 1x: Unpowered glide test series Familiarize pilot with glide characteristics Validate chosen CG location Preliminary validation of control authority
6
Flight Test Plan Flight 2: 1st Powered Flight (outdoors)
Demonstrate sustained powered flight Straight and turning flight Gear will not be retracted; gyro will not be used Flight 3: Envelope expansion (outdoors) Evaluate corrections to Flight 2 deficiencies Cycle landing gear Power-off and power-on stalls Flight with conservative feedback gain
7
Flight Test Plan Flight 4A – 4x: Final shakedown (indoors / outdoors)
Evaluate corrections to Flight 2 and 3 deficiencies Tune gyro gain to desired value Flight 5: Demonstrate design mission (indoors) Fly mission as described in DR&O
8
Materials Cost
9
Break Even Point Final Aircraft Price $228.28 Profit Margin 15%
MSRP of R/C Plane $262.52 Profit Per Aircraft $34.24 Units to Break Even 1,691
10
Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.