1 Transparency in the Energy Community Contracting Parties
Nina Grall-Edler Energy Community Secretariat 28th GRI SSE RCC – , Bucharest

2 Background and Scope GRI SSE Work Program 2015-2018 Methodology
Status report on CP TSOs’ compliance with 3rd package transparency requirements (deadline 12/2015) Closing compliance gaps Publication of data on ENTSO-G platform Methodology Questionnaire comprising all transparency- related provisions of the Directive /73/EC and Regulation 715/2009 circulated to all NRAs of EnC CPs with gas markets: BiH, FYROM, MD, SRB, UA Responses received from all countries, except BIH (partially; ref. NRA competences on state level!)

3 Insight FYR of Macedonia
Information currently published acc to transmission network code, market rules and methodology for calculation of transmission tariffs: capacity allocation mechanisms congestion management procedures information on services offered by TSO as well as technical information necessary for access to the network reasonably and sufficiently detailed information on tariff derivation, methodology and structure calculation methodology for imbalance charges as well as final tariffs No TSO transparency platform Law and secondary legislation implementing 3rd Package are under preparation and should provide ground for increased TSO transparency

4 Insight Moldova Information currently published
Procedures and tariffs for connection Transmission and distribution tariffs and relevant methodologies No TSO transparency platform Law and secondary legislation implementing 3rd Package not yet prepared

5 Insight Serbia Majority of TSO related transparency requirements of Directive 73/2009 and Regulation 715/2009 fulfilled – information published in the relevant network code NRA publishes all information on transmission tariffs and methodologies for their calculation Missing information on capacities offered, ex- ante and ex- post supply and demand information, information on balancing revenues – Network Code requires such publications, however TSO unbundling process is not finalized i.e. activities for which transparency is required are not yet performed Transparency requirements of Annex I of Regulation 715/2009 partly fulfilled actual publications should be provided after the unbundling is finalized and TSO transparency platform is established

6 Insight Ukraine Most of TSO related transparency requirements of Directive 73/2009 and Regulation 715/2009 fulfilled information published on the web page of the TSO or NRA (related to tariff methodology) Some information published on ENTSO-G Platform Network code approved in October CAM, CMP and balancing related information shall be published soon. Transparency requirements of Annex I of Regulation 715/2009 partially fulfilled- information published on TSO web page or ENTSO-G Transparency Platform

7 Outlook Detailed insight report on all 3rd package related gas transparency requirements to be finalised and published early 2016 Ref. Excel sheet PC on findings to identify market views for improvement? Proceed with other elements of the GRI SSE WP Closing compliance gaps Publication of data on ENTSO-G platform

8 Thank you for your attention!