Download presentation
Presentation is loading. Please wait.
Published byKellie Malone Modified over 6 years ago
1
PID T A <> X O2 PLANT FURNACE AIR DUCT SENSOR DEMAND PRESS
ONLY IF OIL USED AS SECONDARY OR STARTUP FUEL FORCED DRAFT FAN ACT OR VFD A T PLANT DEMAND BOILER MASTER BLR DMD PID f(x) X O2 SENSOR Base Fuel/Air Calibration <> FEEDERS AIR DUCT PRESS AIR TO GRATE OR BED FD OIL FUEL AIR TO INDUCED LINKAGE FURNACE ID OVERFIRE JACKSHAFT
2
FURNACE PRESS STEAM FLOW DRUM LEVEL FW FLOW PLANT DEMAND OR DRUM PRESSURE* EXCESS O2 AIR PRESS. UNDERFIRE AIR DAMPER ACTUATOR OVERFIRE AIR DAMPER FD OR VFD ICN ICN ALARM HORN ALARM HORN JACKSHAFT ACTUATOR ALARM HORN ID DAMPER ACTUATOR FW VALVE FEEDER(S) *PLANT DEMAND if there is a Plant Master controller DRUM PRESSURE if there is no Plant Master (requires steam pressure transmitter)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.