P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016

Similar presentations


Presentation on theme: "P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016"— Presentation transcript:

1 P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016
10/18/2015 2:27 PM P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016 Team Members Aleksandr Kim Laura Arciniegas Kevin “KC” Collins Sarah Collmus Kevin “Kevlar” Larkin Suk Min Lee Mike Ostaszewski Team Guides Edward Hanzlik Russell Phelps Thomas Bitter Customer Mario Gomes Consulting Pilot Phil Nguyen © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

2 Agenda Overall System Update Flight Updates Phase IV Deliverables
Risk Table Bill of Materials Week 11 Vision Review, Week 14 Vision Preview Technical Paper and Poster

3 Overall System Update

4 Final Full System CAD Model

5 TA-DA!!

6 Prototype Part - Reel System

7 Prototype Build Process - Reel System
Sawed off one bearing flange on each support to allow them to fit between snap rings. Drilled a small hole on end caps to attach tether Several snap rings broken. Needed 4, used 9. Flat head screws attach end caps to reel. Aluminum plate on top of wood used to mount.

8 Prototype Picture - Motor

9 Prototype Build Process - Motor
Milled out two ¼’’ slots on the mounting plate Aligned the motor into position having tension on the belt Used two ¼’’ Screws with washers hold plate down Searched for capless set screws to mount gear Motor was electrically connected to electrical housing

10 Prototype Part - Base Plate

11 Prototype Build Process - Base Plate
Used previous team’s three leg configuration Attached two Eye-Bolts on either side for steaks Holes drilled using mill machine after marking hole placement with special tools Added thread liners onto top surface for motor Drilled holes using the reel’s flat plate Screwed on the electrical components box Screwed on Ring Plate structure

12 Electrical Wired up full system on protoboard.
Tested full system in Dr. Gomes lab but were unsuccessful. Without this functionality no field test was performed with the reel in and out. This needs to be done ASAP.

13 Bridle

14 Bridle

15 Flight

16 Videos <4/13/16> <4/14/16>
trial into woods trial 2 - trial 3 - trial nose broken <4/14/16> trial lost signal trial taut 1 trial taut 2 trial taut 3 trial taut 4

17 Trial 1

18 Trial 1

19 Trial 4

20 Trial 4

21 Nose glued together

22 Taut We need to make it when it gets taut, it pitches up little bit because when the string is get tight, it turns to the right and goes down.

23 Phase IV Deliverables

24 Risk Management (1/2)

25 Risk Management (2/2)

26 Updated BoM - Full

27 Updated BoM - Mechanical

28 Updated BoM - Electrical & Misc.

29 MSD II Week 11 Plan

30 MSD II Week 14 Plan

31 Technical Paper & Poster
Currently have abstract, some introduction, some process, some recommendations, acknowledgments… The rest of the paper has the instructions for that section according to the template at the top of the section to ensure accurate procedure is followed Poster Background, Team, CAD and Schematics, Components, Analysis, Conclusion, Recommendations, Acknowledgments

32 Any further questions will be taken at this time.
Thank you! Any further questions will be taken at this time.