Download presentation
Presentation is loading. Please wait.
Published byPilar Cruz Ortíz Modified over 6 years ago
1
Little River Ditches Watershed Monitoring Project 11-2000S
Jennifer L. Bouldin, PhD Ecotoxicology Research Facility Arkansas State University
2
arkansaswater.org
3
Little River Ditches Shared with MO and KY ~ 25% in AR
Intensive row crop agriculture
4
Land Use 81.4% cropland 11% forested arkansaswater.org
5
MRBI sampling ISCO sampler set for runoff events
24 ISCO containers analyzed individually Total solids (g/time)
6
Measured Parameters pH Dissolved Oxygen Total Suspended Solids (TSS)
Turbidity Dissolved Nitrate, Nitrite, Orthophosphate Total Nitrogen, Total Phosphorus
7
Ditch Number 4-Buffalo Creek Ditch Number 56
HUC# Ditch Number 56 HUC#
9
Site 1 2415 2164 1714 1242
10
Site 2 1078 2340 1626 2520 1420
11
Site 3 2451 1586 1248
12
Site 4 2457 1686 2052
14
Site 5 7.5 4430 3280 1796 1746
15
Site 7 6.7 5.2 1510 4590 1702 3640 2200
16
Preliminary results High flow vs. low/no flow conditions vary nutrient and TSS values Sediment and nutrients values much higher in primary ditches More TSS spikes in 2013 due to rainfall Comparison of edge-of-field data to instream data will determine direct input from field
17
Thanks to ANRC, Kyle Cassidy, students and technicians at Ecotox
Questions? Thanks to ANRC, Kyle Cassidy, students and technicians at Ecotox
Similar presentations
© 2025 SlidePlayer.com. Inc.