Presentation is loading. Please wait.

Presentation is loading. Please wait.

AESIR Ballooning 02/07/18.

Similar presentations


Presentation on theme: "AESIR Ballooning 02/07/18."— Presentation transcript:

1 AESIR Ballooning 02/07/18

2 Agenda FAR interpretation Fargo Mega Launch
Lab sessions/equipment design Semester timeline/calendar

3 FARs Federal Air Regulations FAR 101.1- 101.4
idx?c=ecfr&rgn=div5&view=text&node=14: &idno=14

4

5

6

7

8

9

10

11

12

13

14

15 Fargo Mega Launch Project overview 14 students, 4 groups UND mentors
Skype calls Launch day

16 HASP Ozone sensor delivery NASA proposal and UND’s responsibilities
Day and night test flights Focus on nighttime ozone profiles 3 sensors HASP launch in September

17 Lab time 2 cutdowns Iridium Arduino and Raspberry Pi sensors
Schedule lab sessions

18 FEBRUARY MARCH APRIL USIP Launches (2) Sensor and cutdown fabrication
Fargo Mega Launch: Mentor selection and Skype call, experiment design HASP ozone sensor payload MARCH HASP launches: day then night Fargo Mega Launch: payload development, Skype calls with mentor LMAH: EVA plan and payload development LPSC: 19th- 23rd APRIL HASP launches continue Fargo Mega Launch: launch in mid April LMAH: launch in late April (2 weeks) NASA Rover Challenge: 13th- 14th


Download ppt "AESIR Ballooning 02/07/18."

Similar presentations


Ads by Google