Download presentation
Presentation is loading. Please wait.
Published byΑνδρόνικος Ζωγράφου Modified over 6 years ago
1
EXAMPLE 10-1 Benefits and Costs of a Convention Center and Sports Complex
2
EXAMPLE 10-2 Equivalence of the B−C Ratio Formulations
continued on next slide
3
EXAMPLE 10-2 (continued) Equivalence of the B−C Ratio Formulations
continued on next slide
4
EXAMPLE 10-2 (continued) Equivalence of the B−C Ratio Formulations
5
EXAMPLE 10-3 B−C Ratio of the Proposed Bypass
6
EXAMPLE 10-4 Including Disbenefits in a B−C Analysis
7
EXAMPLE 10-5 Added Benefit versus Reduced Cost in a Bridge Widening Project
8
EXAMPLE 10-6 Inconsistent Ranking Problem When B−C Ratios Are Inappropriately Compared
9
EXAMPLE 10-7 Incremental B−C Analysis of Mutually Exclusive Projects
continued on next slide
10
EXAMPLE 10-7 (continued) Incremental B−C Analysis of Mutually Exclusive Projects
continued on next slide
11
EXAMPLE 10-7 (continued) Incremental B−C Analysis of Mutually Exclusive Projects
continued on next slide
12
EXAMPLE 10-7 (continued) Incremental B−C Analysis of Mutually Exclusive Projects
continued on next slide
13
EXAMPLE 10-7 (continued) Incremental B−C Analysis of Mutually Exclusive Projects
14
EXAMPLE 10-8 B−C Analysis with Unequal Project Lives
continued on next slide
15
EXAMPLE 10-8 (continued) B−C Analysis with Unequal Project Lives
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.