Download presentation
Presentation is loading. Please wait.
Published byMatthew Trible Modified over 10 years ago
1
The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq February 5, 2010
2
1. 1 st Workshop Overview ( Feb. 1 to Feb. 5 ) MeetingsEquipment IntroductionField Trip
3
2. Settlement Summary CategoriesMOPDCBaghdad Univ.Univ of Tech 1.DesignNO Change Modified Floor Plan by Feb. 10 to KOICA NO Change 2. Altered EquipmentsBeam Projector 3. Additional Requirements Security System Digital Frame Security System TV Monitor(2) Digital Frame Security System TV Monitor(2) Digital Frame 4. Role & Responsibility Transporting 1. KOICA: Korea to Umqasir port in Iraq 2. Iraq: Unloading, Inland Transportation, and Tax procedures from the Port to Sites in Iraq
4
3. Project Schedule CategoryDescriptionDateNotice 1 st Remote Workshop Equipment design and the final settlement Trainee Qualification Feb.1 ~ Feb.5,2010 Complete Trainee Selection Send copy of the Trainee list and passportUntil Feb.28To KOICA Equipment Selection/Support Select Equipments Suppliers March. thru April.2010 Training Systematic installation & operation of the equipments for 3 weeks April, 2010 Delivery & Installation All Equipment Shipped Installation on Site (UB, UOT, MOPDC) May, 2010 August, 2010 2 nd Remote Workshop Monitoring Operation status of the Equipments and Installations Early Sept.
5
شكرا صعوبة في الطقس البارد الكثير من المتاعب.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.