Download presentation
Presentation is loading. Please wait.
1
US Testing Mailing List
UC-Riverside Gale Hanson Patrick Gartung UCSB Joe Incandela Claudio Campagnari Anthony Affolder Russell Taylor Jim Lamb Brad Patterson Sam Burke Derek Barge Chris McGuinness Lance Simms UIC Elizabeta Chabalina Timour Ten KU Alice Bean Don Coppage Len Chistofek FNAL Lenny Spiegel Nicola Bacchetta Slawek Tkaczyk Anatoly Ronzhin UR Paul Tipton Regina Demaria Sergey Korjenevski Ricardo Eusebi Daniel Schwaab E. Groves
2
New Web Pages http://hep.ucsb.edu/cms/UStesting.html
All papers (& drafts) All talks (Tracker/CMS, reviews, …) Testing Procedures Test Results (Updated Bi-weekly) Test Equipment (Updated Regularly) Readiness of stands (Updated Regularly) Name List Hyper-news Paper draft & comments Testing Results Sensor re-probing info CMN module info
3
Testing Results Send updates bi-weekly (Monday prior to meeting)
Modules Summary Module ID, Module Type, Sensor IDs, grade, # bad channels, # bad channels introduced, # sensor bad channels, # hybrid bad channels Table/histogram of sensors used by production year-week for OB1,OB2 CMN modules Module ID, CMN Sensor ID, Depletion Voltage, Turn-on Voltage, Bad Channel, Ratio (Turn-on/Dep) (measured), (predicted) IV curves Measured, Expected (Re-probed), Expected (Sensor DB) Raw Noise vs. Voltage CMN Subtracted Noise vs. Voltage
4
Turn-on/Depletion Voltage
CMN Module Table Module Current (450V) Channel Affected Sensor Affected Turn-on Voltage Depletion Voltage Turn-on/Depletion Voltage 869 1230 29-30 400 247 871 11800 181 120 152 873 2485 14 185 881 18400 30 201 1010 8200 481 250 173 1011 22070 505 150 212 1013 310000 85-88 100 266 1014 25200 96 187 1015 151000 80 218 1016 262400 38 50 208 1030 32050 308 168 1031 20165 336 251 1038 6800 1042 6570 7-10 159 1051 2700 171 20516 12700 95 ??????????????
5
CMN Module Figures
6
Testing Results (2) Sensor Re-probing
Sensor ID, I @V=450 (Re-probe), QTC), DI(Re-probe-Sensor QTC) Table with Sensor Year-Week, # Probed, # DI > 1.5 mA, # DI > 5 mA IV curves of all sensors with DI > 1.5 mA
7
Sensor Re-probing Summary Table
Sensor Week Number Tested >1.5 mA >5 mA % >1.5 mA % >5 mA 143 2 0.0% 147 9 1 11.1% 148 31 4 3 12.9% 9.7% 150 18 202 20 5.0% 203 28 3.6% 208 11 216 8 218 6 220 13 15.4% 7.7% 238 6.5% 239 17 5.9% 241 26 316 5 40.0% 20.0% 318 323 16 327
8
Testing Equipment I will keep list of testing equipment needs per site
ARCS, DAQ module, DAQ rod I need an for every shipment of testing equipment to/from/within US I need a physical inventory performed at FNAL/UCSB to confirm current inventory I will update inventory on web bi-regularly Including list of stuff on-order/shipped I need update on status of test stations regularly Status, problems seen, components needed
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.