Download presentation
Presentation is loading. Please wait.
1
ACTR meeting 9 / 9 / 9
2
DocDB NOTE TO ALL: If you don’t yet know, then please learn how to use DocDB. It Is now more than 2 years old and contains more than 200 files. The idea is to maintain an institutional memory for many valuable documents that are otherwise being lost.
3
Agenda Director’s comments – C.S. ACTR – T.A. 1.5-m echelle – A.T.
SAM – A.T. Coudé room, cryogenics & NEWFIRM – B.G. Console/computer room upgrade – R.L. State of Blanco optics – R.T. Blanco TCS upgrade – G.S. Sites database – D.W. New weather station – E.B.
4
Director’s comments
5
Stimulus package projects
6
New ACTR Projects 1.5-m echelle, Andrei Tokovinin: NEWFIRM
Spectrograph Dewar+CCD NEWFIRM Stimulus money projects: (must be independently tracked.) Aluminizing chamber upgrade Control/computer room upgrade, Ron Lambert Glycol system Coudé room (Sites database, David Walker) (New weather station, Edison Bustos) [RC Spec / rotator refurbishment] Project to be developed
7
CTIO Resource Management
Maintenance of “Master Plan” Look for collisions, overloads. TPM: ACTR top three projects? Currently: SAM Blanco TCS upgrade Blanco radial supports Radial support repair should probably be relegated now (but not closed!) Promote NEWFIRM?
8
DECam preparation at CTIO
Draft installation plan: Includes a prerequisites matrix where preliminary assignments of responsibilities have been made with representatives from both CTIO and DECam Skeleton of DECam preparation at CTIO: Currently in resource identification and allocation. Bi-weekly “Tuesday DECam Meetings” (TDM) started last week. Attendees: ETS & TelOps group leaders, CTIO DECam scientists, & anyone else who wants to come.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.