1 Wind Turbine Energy Conversion System Design and Integration
Advisor: Venkataramana Ajjarapu 2009 Project Team Elsammani Ahmed Hassan Burawi Brandon Janssen Luke Lehman Kenneth Thelen

2 Requirements Integrate with current team Meet grid standards Budget
Supply Power Grid Safety Supply stand alone load Accessibility Display real/reactive power levels from grid/turbine Provide test-bed for additional sources

3 Constraints Meeting budget constraints of $250.00
Meeting grid standards Meeting safety standards Accessibility: shall be able to use testing equipments to measure outputs of wind turbine Location of different system components

4 Assumptions All goals of the group from last semester working on the project are accomplished Supply 200W load Grid frequency of 60 Hz Grid configuration is accessible to connect with load Turbine chosen to meet building codes, federal electrical regulations, fixed speed, etc.

5 Conceptual Sketch

6 Costs Our Budget: $250 Computer Hardware
Materials (Electrical connectors, additional wires, test equipment)

7 Schedule Weekly Meetings – Twice a week With Advisor: Dr. Ajjarapu
With Group Class Schedule: - Week 3: Start Weekly Report Week 6: Project plan –presentations on slides Week 7: Final Project Plan Report Week 13: Draft Design: presentation slides Week 15: Final Design Report Week 16: Design Reviews Group Objectives throughout semester Order Parts Assembly Monitoring Testing