Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ben Rushwald CEE 424 Final Project

Similar presentations


Presentation on theme: "Ben Rushwald CEE 424 Final Project"— Presentation transcript:

1 Ben Rushwald CEE 424 Final Project
Site Selection and GIS Analysis of Potential Wind Farms in Washington State Ben Rushwald CEE 424 Final Project

2 Utility Scale Wind Turbines
Source of renewable energy Growing industry and source of energy harness kinetic energy of the wind Is becoming more and more price competitive with traditional sources of energy Vehicle

3 SITE RESTRICTIONS Wind Class of 4 or greater On a scale of 1 to 7
The turbines CAN NOT be placed In mountainous rugged regions Within 5 miles of urban areas In National Parks

4 Analysis Gathered layers for all restrictions
Good wind speed data is important DEM data is raster All others layers are vector data

5 Analysis, cont Vector polygon created of elevations under 2000ft
A polygon of areas with wind speeds of class 4 or greater was created

6 Analysis, cont Other restrictions displayed and buffered
These areas removed from the wind speed polygon Current Wind Farms Identified

7 Results Potential Wind Site
Located areas in Washington state where the wind speed is the greatest Looked at tribal land for potential sites for potential income The Columbia River has highest wind speeds -Many farms already located there Potential near Ellensburg Smaller potential near South Bend Potential Wind Site


Download ppt "Ben Rushwald CEE 424 Final Project"

Similar presentations


Ads by Google