Presentation is loading. Please wait.

Presentation is loading. Please wait.

on 1st Quarter Performance against the 2010/11 Strategic Plan

Similar presentations


Presentation on theme: "on 1st Quarter Performance against the 2010/11 Strategic Plan"— Presentation transcript:

1 on 1st Quarter Performance against the 2010/11 Strategic Plan
Presentation to the Portfolio Committee on Water and Environmental Affairs on 1st Quarter Performance against the 2010/11 Strategic Plan Department of Water Affairs 4 August 2010 1

2 Outline of the Presentation
MEA PERFORMANCE REPORT WTE PERFORMANCE REPORT ROADMAP FOR THE REDUCTION OF VACANCY RATE Outline of the Presentation 2

3 PURPOSE OF THE PRESENTATION
To provide the actual performance information against the 2010/11 Strategic Plan. 3

4 Against the 2010/11 strategic plan (MAIN EXCHEQUER ACCOUNT)
PART A Performance Against the 2010/11 strategic plan (MAIN EXCHEQUER ACCOUNT) 4

5 1st Quarter Performance Report
Strategic Priority 1: Contribution to effective economic growth and social development Strategic Objectives: Ensure strategies and feasibility plans exist to reconcile water requirements and availability Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Strategies and feasibility plans to reconcile water requirements and available resources Number of strategies and feasibility plans completed Reconciliation strategies completed in 3 areas 2 strategies and 1 plan produced Development of 2 Strategies (Algoa system (Stage 2), and Mzimvubu Catchments area) continued ON TARGET: Development of reconciliation Strategies for Algoa system (Stage 2), and Mzimvubu Catchments area continued Implementation of the desalination and recycling strategies Finalised desalination strategy Desalination and Recycling Strategy Concept note developed Desalination Strategy finalised and approved Development of a Desalination Strategy started ON TARGET: Draft desalination strategy developed for internal comment 1st Quarter Performance Report 5

6 1st Quarter Performance Report
Strategic Priority 1 : Contribution to effective economic growth and social development Strategic Objectives: Effective creation of decent employment through infrastructure delivery Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Creation of decent employment through regional bulk programme Number of decent jobs created 5908 1105 200 BEHIND TARGET: 145 (Only 1 project is operational in cluster 2 Chris Hani DM) Strategic Objectives: Ensure the provision of regional bulk water Implementation of the Regional Bulk schemes to support access to water and sanitation programmes Number of bulk infrastructure schemes implemented per year 45 54 35 under construction ON TARGET: 35 regional bulk schemes under construction 1st Quarter Performance Report 6

7 1st Quarter Performance Report
Strategic Priority 1 : Contribution to effective economic growth and social development Strategic Objectives: Development, maintenance and rehabilitation of bulk water infrastructure Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Rehabilitation and refurbishment of the transferred water services schemes Number of transferred schemes refurbished 1000 130 To be reported on the Second Quarter Number of staff transferred 5200 1st Quarter Performance Report 7

8 1st Quarter Performance Report
Strategic Priority 1 : Contribution to effective economic growth and social development Strategic Objectives: Development, maintenance and rehabilitation of bulk water infrastructure Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Reviewing the pricing strategy and infrastructure funding model Percentage implementation of the milestones in the pricing strategy As-Is” situation analysis of water pricing and funding model has been done 80% Implementation of the milestones in the pricing strategy and funding model Infrastructure Asset Management strategy finalised BEHIND TARGET: 5% completion of work. Report on the current status of infrastructure funding prepared. A draft project charter developed. Five work streams developed 1st Quarter Performance Report 8

9 Performance Indicator Baseline information
Strategic Priority 1 : Contribution to effective economic growth and social development Strategic Objectives: Development, maintenance and rehabilitation of bulk water infrastructure Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Implementation of the Strategy for the operations and maintenance of water services infrastructure Finalised strategy for operations and maintenance of water services infrastructure Draft strategy in place Finalisation of the strategy for operations and maintenance of water services infrastructure Infrastructure Asset Management strategy finalised ON TARGET: Infrastructure Asset Management strategy finalised 9

10 1st Quarter Performance Report
Strategic Priority 1: Contribution to effective economic growth and social development Strategic Objectives: Ensure effective implementation of the Pricing strategy and funding model Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Strategic Priority 2: Contribution to rural development, food security and land reform Strategic Objectives: Create sustainable rural livelihoods Implementation of the rain water harvesting programme Number of additional rainwater harvesting tanks distributed for food production 500 5000 1280 ON TARGET: 1587 (Additional roll over funds were available) 1st Quarter Performance Report 10

11 1st Quarter Performance Report
Strategic Priority 2: Contribution to rural development, food security and land reform Strategic Objectives: Create sustainable rural livelihoods Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Provision of adequate support to poorly resourced farmers Number of job opportunities created by Working for Water (WfW) per year 23 700 25 300 7770 ON TARGET: (Regions) Implementation of the Natural Resource Management Programmes to support EPWP Number of job opportunities created by Working on Fire (WoF) per year 1669 2221 1200 ON TARGET (Regions) Number of SMMEs established through Working for Water (WfW) programme 1442 1650 495 ON TARGET 903 (Regions) 1st Quarter Performance Report 11

12 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Improve equity in water allocation Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Eradicate license application backlogs Percentage reduction in licensing backlog 3462 current estimated backlog 100% 20% ON TARGET: 29% Accelerated effort on the Letsema Project and capacity building) Allocation of water to Historically Disadvantaged Individuals (HDIs) Number of water licenses issued per year 200 250 50 165 issued 1 Declined (Accelerated effort on the Letsema Project) Number of new water management areas in which compulsory licensing processes have been completed 2 Gazette compulsory licensing process for 2 WMA BEHIND TARGET: Submission prepared for the approval of call for compulsory licensing 1st Quarter Performance Report 12

13 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Ensure sustainable water use Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Improved water use efficiency Revised National Water resources Strategy in place 1st edition NWRS (2004 2nd edition NWRS gazette for public consultation Overarching framework and communication strategy developed ON TARGET Overarching framework and communication strategy developed Strategic Objectives: Improve equity in water services and management Amendment of the water related legislations Water Services Amendment Bill gazetted for consultation First draft completed of the Amendment Bill Public consultation on the Amendment Bill Submission for approval to review ON TARGET Submitted for approval to review. 1st Quarter Performance Report 13

14 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Protection and improvement of water quality Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Ensure the improvement of water quality Water resources Classifications Regulations classified Draft water resources classification regulations Finalised and Implemented Water resources Classifications Regulations Stakeholder consultation report compiled and regulations revised. ON TARGET Stakeholder consultation report compiled and regulations revised accordingly and submitted to Chief State Law Advisor for final approval. Number of Water Management Areas (WMAs) in which water resources have been classified 2 Scoping phase completed. ON TARGET Project scoping phase completed 1st Quarter Performance Report 14

15 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Protection and improvement of water quality Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Implementation of the Waste Discharge Charge System (WDCS) Number of catchments where WDCS is implemented WDCS implemented in 2 catchments Inception report developed BEHIND TARGET: Inception report not achieved (as planned for Q1) due to delays in the procurement process 1st Quarter Performance Report 15

16 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Protection and improvement of water quality Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Implementation of the river health programmes Number of river health projects implemented 4 9 projects (one per region) 2 projects in 2 regions ON TARGET: EC - Monitoring was done in 7 rivers, Kowie, Kouga/Gamtoos, Baviaans, Mbashe, Buffalo, Great Kei, Keiskamma Rivers. GP:Monitoring of water quality on Vaal river took place. Study on “Fisk Kill in Vaal river” has been completed and awaiting final report. FS:Modder, Riet and Caledon Rivers, mostly FAII, RVI, Geomorphology and Physi-chemical parameters were done and a State of Modder River Was produced by the University of Free State: CEM for Bloemwater. 1st Quarter Performance Report 16

17 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Protection and improvement of water quality Outputs Performance Indicator Baseline info 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Implementation of the river health programmes cont… Number of river health projects implemented 4 9 projects (one per region 1 per region cont…. NC: Lower Vaal River, MIRAI, Harts River only one site, MIRAI. Lower Orange River downstream Vanderkloof Dam as part of the Reserve was done. WC:Finalisation of the comprehensive Berg Winter sampling on G2 and G1 sites Implementation of the Compliance Monitoring and Enforcement (CME) Programmes Number of cases successfully addressed 40 45 5 BEHIND TARGET: To be reported 2nd quarter 0 achievement due to the complexity of cases. Administrative and criminal proceedings dependent on law enforcement agencies 1st Quarter Performance Report 17

18 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Protection and improvement of water quality Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Implementation of the Compliance Monitoring and Enforcement (CME) Programmes Number of notices issued 29 35 10 BEHIND TARGET: To be reported 2nd quarter Number of directives issued 23 25 1st Quarter Performance Report 18

19 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Protection and improvement of water quality Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Reduction in invasive plants cleared through Working for Water Programme Hectares of land cleared per year BEHIND TARGET: – delays caused by putting out order numbers which is now finalised and therefore the process will be fast tracked in the second quarter. Woodlands Restored through Working for Woodlands Programme Hectares of land converted woodlots per year 990 1655 680 As a result of the review of the restructuring process 1st Quarter Performance Report 19

20 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Protection and improvement of water quality Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Ensure implementation of Integrated Veldt and Forest Fire Management Number of fires attended to 900 820 41 ON TARGET: 196 (More fire incidents were reported than anticipated) Hectares veldt fires attended to per year 22 350 BEHIND TARGET: 9 310 1st Quarter Performance Report 20

21 1st Quarter Performance Report
Strategic Priority 3: Ensuring sustainable and equitable water resources management Strategic Objectives: Ensuring adequate information and knowledge to sustainably manage water resources Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Provision of water resources information Number of prioritised catchments optimally monitored 2 catchments optimally monitored 5 priority catchments High level Implementation Plan developed ON TARGET: Development of High level implementation plan completed Strategic Priority 4: Effective support to local government Strategic Objectives: Implementation of the Local Government Turnaround Strategy Effective Support Provided to all municipalities Number of municipalities that received support interventions 80 169 BEHIND TARGET : 124 municipalities were supported with the assessment of IDPs. (WC and NW were not assessed and indicated readiness with effect from 25 July and 3 August respectively). 1st Quarter Performance Report 21

22 1st Quarter Performance Report
Strategic Priority 4: Effective support to local government Strategic Objectives: Implementation of the Local Government Turnaround Strategy Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Effective Support Provided to all municipalities CONT… Total number of municipalities supported in implementing water conservation/ water demand management 80 4 1 ON TARGET: 1 City of Cape Town Effective participation in Provincial and National Intergovernmental structures Number of Provincial Indaba action plans implemented 9 Indaba action plans developed 9 Consolidation of nine action plans BEHIND TARGET : 7 Action plans in place in regions where the Provincial Water Indabas has taken place. GP and NC Water Indabas to be conducted on 19 – 20 August and 2 September2010 respectively 1st Quarter Performance Report 22

23 1st Quarter Performance Report
Strategic Priority 5: Contribute to global relations Strategic Objectives: Strategic leadership and engagements of the Department in multilateral forums Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Provide effective leadership of AMCOW and strategic multilateral forums Effective function of AMCOW Secretariat South Africa as current Chair of AMCOW for the next two years Strengthening all organs of AMCOW 2 seconded officials on board BEHIND TARGET: Recruitment process initiated for both posts. 1 Selection process completed for one post, awaiting HR to finalise appointment. Re-advertisement in process (quality of applicants poor) 1st Quarter Performance Report 23

24 1st Quarter Performance Report
Strategic Priority 5: Contribute to global relations Strategic Objectives: Forging strategic relationships with countries in Africa and the world (North-South, South-South) Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Supporting PCRD countries to move away from their status Number of bilateral co-operation agreements with African countries implemented 2 agreements in place 4 Engagement of 4 Africa bilateral countries – Post Conflict and Reconstruction and Development (PCRD) 1 BEHIND TARGET: DRC Cooperation Agreement in the legal process for finalisation. Rwanda: action plan was drafted on SA/Rwanda capacity building. Resources will mobilised to implement the action plan. Russia: formalised the working group. Action plan drafted by both parties 1st Quarter Performance Report 24

25 1st Quarter Performance Report
Strategic Priority: Strategic Priority 5: Contribute to global relations Strategic Objectives: Strategic leadership and engagements of the Department in multilateral forums Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Sharing knowledge and expertise on water related issues Number of multilateral engagements international countries 2 multilateral agreements in place (North-South and South-South) 1 Engagement on multilateral relations with India, Brazil and South Africa (IBSA) 1 Engagement ON TARGET: Engagement on high level meeting of developing and donor agencies aimed at ensuring that new developing nations meet their MDG targets under the auspices of AMCOW DWA contributed to the United Nations Commission on Sustainable Development (UNCSTD) process on sustainable development (water quality, sanitation, etc) 1st Quarter Performance Report 25

26 1st Quarter Performance Report
Strategic Priority: Strategic Priority 5: Contribute to global relations Strategic Objectives: Ensure effective implementation of regional cooperation agreements Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Provide coordination on regional (Southern African Development Community (SADC) and continental water issues Level of effectiveness of the functioning of the water structures Implementation of the SADC Protocol on water Finalisation of the Memorandum of Understanding (MoU) for the SADC Hydrological Cycle Observing system (HYCOS) Project Phase III DWA participates in all SADC water structures ON TARGET: MoU went through the legal process and finalised. DWA participated in the SADC Annual Ministers’ to review progress / made within SADC of Water. Report was approved by Ministers. DWA has also participated in the Sectoral and Inter-Sectoral SADC Ministers responsible for infrastructure and development. A report on water issues was adopted. 1st Quarter Performance Report 26

27 1st Quarter Performance Report
Strategic Priority 5: Contribute to global relations Strategic Objectives: Ensure support to Water Sector Institutions within SADC Outputs Performance Indicator Baseline info 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Documentation of best practice case studies Number of best practice case studies documented 3 1 Agreement signed with Swaziland ON TARGET: Preparatory work on the agreement with Swaziland was completed for signing in July. Hosted the Senior\ Officials meeting on ORASECOM in May 2010 with a view to manage the shared water courses between the 4 countries (Lesotho, Namibia, SA and Botswana) DWA secured office space for ORASECOM 1st Quarter Performance Report 27

28 1st Quarter Performance Report
Strategic Priority 6: Improve the Department’s capacity to deliver quality services Strategic Objectives: To ensure alignment of institutions to meet legislative mandates Outputs Performance Indicator Baseline information 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Compliance to legislative mandates by institutions Percentage compliance to legislative requirements by all institutions 100 ON TARGET: 100% Business Plans, SCs of 13 Water Boards, TCTA, WRC and CMAs 1st Quarter Performance Report 28

29 1st Quarter Performance Report
Strategic Priority 6: Improve the Department’s capacity to deliver quality services Strategic Objectives: Ensure effective organisational performance management Outputs Performance Indicator Baseline info 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Implementation of an organization performance monitoring and Evaluation system Automated Organisational Performance Monitoring and Evaluation system in place Manual system is available Automated Organisational Performance M&E system implemented First draft of the scorecard content of the system produced ON TARGET: First draft of the scorecard content of the system produced 1st Quarter Performance Report 29

30 1st Quarter Performance Report
Strategic Priority 6: Improve the Department’s capacity to deliver quality services Strategic Objectives: Ensure effective organisational performance management Outputs Performance Indicator Baseline info 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Implementation of the Risk Management Framework Approved Risk Management Framework in place and implemented Draft Framework in place Risk Management Framework approved and implemented Compile risk register ON TARGET: Risk register in place and framework approved. Three workshops held in WC, NW,GP 1st Quarter Performance Report 30

31 1st Quarter Performance Report
Strategic Priority 6: Improve the Department’s capacity to deliver quality services Strategic Objectives: Ensure effective organisational performance management Outputs Performance Indicator Baseline info 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Implementation of the 3 year Internal Audit Strategic Plan as approved by Audit Committee Percentage implementation of the Internal Audit Coverage Plan 50% of the Internal Audit Coverage Plan implemented 100% implementation of the Internal Audit Coverage Plan Approved three year strategic plan and implementation thereof. ON TARGET: Three year strategic plan approved and implementation at 25% Strategic Objectives: Improve financial management capacity Effective implementation of the Financial Improvement Plan Percentage achievement of milestones as contained in the plan 100% of the milestones implemented 100% 80% of milestones in the financial improvement action plan achieved ON TARGET: 90% 1st Quarter Performance Report 31

32 1st Quarter Performance Report
Strategic Priority 6:Improve the Department’s capacity to deliver quality services Strategic Objectives: Improve financial management capacity Outputs Performance Indicator Baseline info 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Improvement of revenue management Number of days in which debts remain uncollected 120 days 60 days BEHIND TARGET: 192 days Strategic Objectives: Development of appropriate skills to address the sector needs Development of graduate trainees for placement into permanent positions through the learning Academy Percentage of graduate trainees developed and into permanent positions 30% of the 2007 intake - To be reported on in the 2nd quarter Number of learnerships implemented 86 100 learnerships 50 learnerships will be implemented in the 2nd quarter 1st Quarter Performance Report 32

33 1st Quarter Performance Report
Strategic Priority:Improve the Department’s capacity to deliver quality services Strategic Objectives:Improve the Department’s capacity to deliver quality services Outputs Performance Indicator Baseline info 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Development of graduate trainees continued Number of internships implemented 128 50 internships 50 implemented BEHIND TARGET: The internship programme was put on hold pending ascertainment and confirmation of the vacancy rate. Conduct skills gap analysis for the water sector Report with findings on sector skills gaps produced Conduct sector skills gap analysis and produce a report - To be reported on in the second quarter 1st Quarter Performance Report 33

34 1st Quarter Performance Report
Strategic Priority 6:Improve the Department’s capacity to deliver quality services Strategic Objectives: Implementation of Gender and Disability Mainstreaming Programmes Outputs Performance Indicator Baseline info 2010 Performance against targets 2010/11 Target 1st quarter milestone Actual achievement Implement woman empowerment projects Number of women empowerment projects implemented 2 projects developed and implemented 2 projects proposals developed and approved ON TARGET: 2 project proposals developed and approved Strategic objective: Improved Public Understanding and appreciation of the Value of Water by All South Africans Implementation of Public Education and Awareness Plan Number of public education Awareness interventions implemented as per the plan 4 4 interventions 1 joint campaign held and report submitted 2 Joint campaigns undertaken with WISA and Ekurhuleni 1st Quarter Performance Report 34

35 Against the 2010/11 strategic plan (Water Trading Entity)
PART B Performance Against the 2010/11 strategic plan (Water Trading Entity) 35

36 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Strategic Objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Implementation of new bulk water infrastructure to meet social water needs, economic growth and development Percentage completion of the project as per project plan De Hoop Dam 44% complete De Hoop Dam 73% complete 50% BEHIND TARGET 49% complete Nandoni Water Treatment Works 95% complete Nandoni Water Treatment Works 100% complete 98% 95% complete 36

37 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Strategic Objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Implementation of new bulk water infrastructure to meet social water needs, economic growth and development Percentage completion of the project as per project plan Nandoni Distribution 38% complete Nandoni Distribution 51% complete 66% BEHIND TARGET: 38 % complete Inyaka Water Treatment Works 62% complete Inyaka Water Treatment Works 81% complete 68% ON TARGET: 68% complete 37

38 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Strategic Objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Implementation of new bulk water infrastructure to meet social water needs, economic growth and development Percentage completion of the project as per project plan MCWAP 1: Mokolo and Crocodile River Water Augmentation 5% 10% 6% Directive issued. RID issued. WSA signed. BEHIND TARGET 5% KWSAP: Komati Water supply Augmentation 35% 9.5% MMTS-2 Mooi-Mgeni Transfer Scheme 5% 7.5% 38

39 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Strategic Objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Implementation of new bulk water infrastructure to meet social water needs, economic growth and development Percentage completion of the project as per project plan Raising of Clanwilliam Capital Project 0% complete 5% 1% BEHIND TARGET: 0.5% VRESAP: Vaal River Eastern Sub-system Augmentation Project 99% 100% 99.2% The Contractor achieved no progress on site. After following contractual procedures the Contract VO21 was terminated and Contractor handed over site to TCTA 39

40 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Implementation of new bulk water infrastructure to meet social water needs, economic growth and development cont…. Percentage completion of the project as per project plan Hluhluwe Regional Water Scheme 67% complete Hluhluwe Regional Water Scheme 87% complete 74% BEHIND TARGET: 66% complete Mdloti River Development (Raising of Hazelmere dam) 5% complete Mdloti River Development (Raising of Hazelmere Dam) 40% complete 10% 8% complete Groot Letaba RWRP (N’wamitwa Dam and raising of Tzaneen Dam) 5% complete Groot Letaba RWRP (Nwamitwa Dam and raising of Tzaneen Dam) 10% complete 6% ON TARGET 6% complete 40

41 Performance Indicator (s) Baseline information
Strategic Priority 1 : Contribution to economic growth and social development Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Supply of Water to users Percentage level of assurance of supply 100% compliance to levels of assurance of supply for different user group 100% level of assurance of supply for different user group 100% BEHIND TARGET: 80% compliance to levels of assurance of supply for different user groups 41

42 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Maintenance of infrastructure as per maintenance plan and procedures required to ensure infrastructure availability Percentage infrastructure availability 70% availability 80% availability 70% ON TARGET: Maintain infrastructure according to maintenance plan 65% Planned work completed 20% 42

43 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Resources Management Plans (RMPs) developed Number of RMPs completed Nil Complete RMP implementation Action plan for NWRI only 1st draft of action plan completed 5% of Action Plan completed Existing RMPs implemented Number of existing RMPs implemented RMP operational within 12 months - To be reported in the 2nd quarter 43

44 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Dam safety rehabilitation programme Number of dams rehabilitated 24 dams rehabilitated 0 dams rehabilitated 2 dams to be under rehabilitation ON TARGET: 1 dam rehabilitated and second dam rehabilitation in progress Number of dams under construction 7 dams under construction 1 dam under construction 11 BEHIND TARGET: 1 dam Number of dams in design phase 14 dams in design phase 44

45 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Strategic objective: Development, maintenance, rehabilitation and refurbishment of bulk water infrastructure Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Strategy for the conversion of single to multi-purpose dams developed Nil Approved strategy 1st draft of strategy Embarked consultation process with Regions and Municipalities 45

46 Performance Indicator (s) Performance against targets
Strategic Priority 1 : Contribution to economic growth and social development Strategic Objective: Effective creation of decent employment through infrastructure delivery Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Creation of decent jobs and ensures appropriate training of employees Number of decent jobs created 4368 220 275 ON TARGET: 535 Promotion of SMMEs through procurement of goods and services Budget spend on BEE and SMMEs Percentage of contact value awarded to SMMEs and BEE enterprises BBBEE Strategy approved 50% 10% 45% 46

47 Performance Indicator (s) Performance against targets
Strategic Priority 2 : Ensuring sustainable and equitable water resources management in all water management areas Strategic Objective: To provide monitoring and assessing water resources availability and use Output (s) Performance Indicator (s) Baseline information Performance against targets 20010/11 Targets 1st quarter milestone Actual achievement Implementation of hydrology and Geo hydrology monitoring systems and water quality monitoring Number of operational monitoring programmes implemented 11 15 1 programme implemented ON TARGET: Number of sampling points monitored 100 104 27 sampling points monitored 890 47

48 ROADMAP ON THE FILLING OF FILLING OF VACANT POSTS
PART C ROADMAP ON THE FILLING OF FILLING OF VACANT POSTS 48

49 VACANCY BY BRANCH 49 BRANCH FILLED VACANT TOTAL VACANCY % 119 41 160
MINISTER / DG / COO / IA 119 41 160 25.63 CORPORATE S. 594 85 679 12.52 FINANCE 318 478 33.47 REGIONS 3418 521 3939 13.23 NWRI 2744 346 3090 11.20 POLICY & REG. 500 144 644 22.36 INT. RELATIONS 25 12 37 32.43 Grand Total 7718 1309 9027 14.50 49

50 GRAPHICAL PRESENTATION
50

51 VACANCY BY SALARY LEVEL
BRANCH SALARY LEVEL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 TOTAL MIN/DG/COO/IA 41 CORPORATE S. 23 85 FINANCE 36 51 32 27 160 REGIONS 18 26 101 83 92 47 21 521 NWRI 39 62 44 43 346 POLICY & REG. 56 19 144 INT. RELATIONS GRAND TOTAL 80 45 156 217 209 197 113 37 69 1309 51

52 EMPLOYMENT EQUITY AND VACANCY RATE
BRANCH AFRICAN INDIAN COLOURED WHITE TOTAL Male Female No. % MINISTER / DG 39 32.77 70 58.82 0.00 2 1.68 5 4.20 3 2.52 75 63.03 44 36.97 119 CORPORATE S. 219 36.87 275 46.30 0.84 11 1.85 29 4.88 6.57 330 55.56 264 44.44 594 FINANCE 108 33.96 141 44.34 1 0.31 4 1.26 1.57 14 4.40 13.84 190 59.75 128 40.25 318 REGIONS 1573 46.02 1230 35.99 27 0.79 34 0.99 171 5.00 104 3.04 166 4.86 113 3.31 1481 43.33 1937 56.67 3418 NWRI 1681 61.26 378 13.78 13 0.47 6 0.22 196 7.14 43 11.59 109 3.97 536 19.53 2208 80.47 2744 POLICY & REG. 168 33.60 172 34.40 1.00 9 1.80 1.20 67 13.40 64 12.80 251 50.20 249 49.80 500 INT. RELATIONS 2.60 0.20 0.40 16 64.00 36.00 25 3797 2279 51 65 392 161 599 374 2879 37.30 4839 62.70 7718 Grand Tot. 6076 116 553 973 52

53 ROADMAP The Department is in the process of developing a recruitment strategy aligned to the HR plan 2. The Department engaged with a tender to procure the services of a PSP to manage response handling for recruitment 3. The Department is in the process of developing a project to align structure, establishment and compensation of employees. 53

54 THE END 54