Fast Track Modifications Keith Reinsmith PPL Susquehanna
Tuesday June 3, 2008
2
Fast Track Modifications
Plant changes are the biggest exposure to the health of a station’s CM program Plants have strong processes and controls around ‘normal’ modifications Often are challenged to accelerate this process to get a modification developed and implemented quickly (a fast track modification) Higher risk of errors, near misses, and CM issues exist from this type of modification.
3
Fast Track Modifications
A plant change that is scoped, designed, planned, installed and tested all in a very short time frame. Typically in response to an emergent degraded plant condition or to address a new regulatory requirement or discovered non-compliance. Poses challenges to human performance and Configuration Management
4
Human Performance Challenges
Engineer Fatigue Lack of attention-to-detail Working to assumptions that were not or could not be validated Inadequate peer reviews Imprecise or incomplete communications among project team members Inadequate vendor oversight Inadequate post-mod training (operators, maintenance personnel)
5
CM Challenges Insufficient inputs to design (wrong solution)
Incomplete designs Latent errors introduced Overlooked impacted FCI sources Concurrent design/ installation Insufficient planning of installation Installation problems requiring design rework Inadequate post-installation testing
6
Logistics Challenges Material availability/ expediting
Lack of qualified workers (engrs/ craft) System availability
7
How to Mitigate Risks Requires a disciplined approach; can’t let schedule drive process Need to recognize and address potential error traps Develop special actions to mitigate identified risks. Breakout Session: Looking for industry best practices to improve performance in Fast Track modifications