Presentation is loading. Please wait.

Presentation is loading. Please wait.

1st Quarter Project Due: Friday, October 2.

Similar presentations


Presentation on theme: "1st Quarter Project Due: Friday, October 2."— Presentation transcript:

1 1st Quarter Project Due: Friday, October 2

2 Objective Gain experience in designing a survey and analyzing quantitative data by using univariate data exploration techniques

3 Design a survey methodology
how to collect data from a sample size of at least 60 EHS students

4 Design a survey methodology
how to collect data from a sample size of at least 60 students Brainstorm what factors about students to explore each member of class must explore a unique factor

5 Design a survey methodology
how to collect data from a sample size of at least 60 students Brainstorm what factors about students to explore each member of class must explore a unique factor 3. Conduct survey based on methodology

6 Design a survey methodology
how to collect data from a sample size of at least 60 students Brainstorm what factors about students to explore each member of class must explore a unique factor Conduct survey based on methodology Analyze collected data using Fathom

7 You will have one class period to enter data into Fathom and work on your write- up
Additional time will be on your own time

8 Project will be graded based on rubric
Handwritten project receives a zero

9 Now, brainstorm 30 possible factors for exploration


Download ppt "1st Quarter Project Due: Friday, October 2."

Similar presentations


Ads by Google